/ / / / / /
DEPLOYEDLOGIX.COM // @DEPLOYEDLOGIX // EMAIL: [email protected] // P: 541.357.5978
©️ 2021 DLX ENTERPRISES LLC. // VERSION 1.02
//
11
!!
LOWER TWO (2) ADJACENT SIDES
SIMULTANEOUSLY TO MINIMIZE
STRESS ON FRAME JOINTS
2 PERSON MIN. 3 OPTIMAL
CAUTION!
REMOVE LEGS &
LOWER SHELTER
DRAIN INSTALLATION
DRAIN PUMP INSTALLATION
INSULATION REMOVAL
SHELTER STRIKE
4
5
Once corners have been folded inwards, roll up and tie off with
provided straps.
REPEAT STEP 3 & 4 FOR EACH CORNER SEGMENT!
Lower shelter in halves, one side at a time. Using four (4) personnel,
lift two (2) corners and remove both sets of legs. Lower shelter to
ground. Proceed to opposite half and repeat process.
Summary of Contents for ASAP-HUB
Page 19: ...18 ...