background image

/ / / / / /

DEPLOYEDLOGIX.COM //                 @DEPLOYEDLOGIX // EMAIL: [email protected] // P: 541.357.5978

©️ 2021 DLX ENTERPRISES LLC. // VERSION 1.02

//

11

!!

LOWER  TWO (2) ADJACENT SIDES

SIMULTANEOUSLY TO MINIMIZE 

STRESS ON FRAME JOINTS

  

 

2 PERSON MIN. 3 OPTIMAL

CAUTION!

REMOVE LEGS &

LOWER SHELTER

DRAIN INSTALLATION

DRAIN PUMP INSTALLATION

INSULATION REMOVAL

SHELTER STRIKE 

4

5

Once corners have been folded inwards, roll up and tie off with 

provided straps.

REPEAT STEP 3 & 4 FOR EACH CORNER SEGMENT! 

Lower shelter in halves, one side at a time. Using four (4) personnel, 

lift two (2) corners and remove both sets of legs. Lower shelter to 

ground. Proceed to opposite half and repeat process. 

Summary of Contents for ASAP-HUB

Page 1: ... 2021 DLX ENTERPRISES LLC VERSION 1 02 PROUDLY MADE IN THE USA CAGE CODE 7CFK2 DUNS 079751064 SBA 8 a CERTIFIED ENGLISH MANUAL ...

Page 2: ...imited warranty on workmanship is limited to defects at the time of manufacturing and does not cover general wear tear or misuse of the product The warranty does not cover damage caused by abuse misuse neglect or improper care by the end user in the application of the Deployed Logix product The products and or components not manufactured by Deployed Logix shall be subject only to the warranty exte...

Page 3: ...ENT ARCH SECTION SETUP ARCH SECTION SETUP 1 2 Retrieve arch sections from labeled frame bags Swing joints and pin in place Be sure to orient pins toward interior of shelter to prevent pin extraction Retrieve ridge support bars from labeled frame bags Insert into socket with label A facing up Pin in place Connect arms along frame making sure angle points to center Label B should align with each oth...

Page 4: ...DRAIN PUMP INSTALLATION SPRAYER ADJUSTMENT CENTER FRAME SETUP SHOULDER SUPPORT BARS 3 4 Position center frame section in desired location Lift and connect arch sections in a clockwise or counterclockwise rotation Pin in place with cable underneath frame Connect shoulder support bars Orient support bar so that the Label D faces up Insert pin down into socket to secure ...

Page 5: ...ION DRAIN PUMP INSTALLATION ROOF INSTALLATION SPRAYER ADJUSTMENT INSULATION INSTALLATION INSULATION INSTALLATION 5 6 IF NOT UTILIZING INSULATION SKIP TO STEP 8 Locate centerline of insulation liner connect snap clips to center point on cables then attach loops along centerline frame Connect insulation liner along opposite ridge line ...

Page 6: ...COVER INSTALLATION 7 8 Connect insulation liner around remaining perimeter of shelter framework Each quadrant of the shelter will have a minimum of four 4 attachment points BLACK ARROWS for a total of sixteen 16 perimeter attachment points Retrieve roof cover Unfold starting at one side Unroll to opposite side Place grommet onto post Connect pins at provided locations with open end facing out ...

Page 7: ...INSTALLATION DRAIN PUMP INSTALLATION ROOF INSTALLATION SPRAYER ADJUSTMENT ENDWALL ATTACHMENT LEG ATTACHMENT 9 10 Attach endwalls Begin attachment at peak of shelter and work outward from center connecting hook and loop strips NOTE Endwalls can be attached once shelter is fully erected Lift shelter one half first Using four 4 personnel lift at two corners and attach two 2 legs per corner Once first...

Page 8: ...TTACHMENT ENDWALL INSULATION ATTACHMENT 11 12 Connect shelter footpads Align posts with socket on leg segments secure using pins with open end facing inward Connect lanyards around 4 base sides Complete connection of endwall hook and loop strips along vertical portion of shelter If insulation was utilized during setup complete attachment of loops to shelter frame segments at corner ...

Page 9: ...RAIN PUMP INSTALLATION FLOOR ATTACHMENT FOLD DOWN SKIRTS 13 14 Layout floor gray side up and position so the reinforced vinyl segment aligns with each corner of the shelter frame Fold up floor and connect hook and loop strips on floor to matching strips underneath endwall skirts Fold down skirts on endwalls and corner cover to deflect rain run off away from seams Connect buckle on interior of shel...

Page 10: ...NG SHELTER STRIKE 1 SHELTER MUST BE STAKED SECURED AT ALL TIMES WHEN ERECTED FAILURE TO SECURE STRUCTURE COULD RESULT IN DAMAGE TO EQUIPMENT OR SERIOUS PERSONAL INJURY Begin strike of shelter by removing all installed accessories Discon nect all power sources and climate control systems Start by remov ing and folding endwalls Folding instructions are provided at Step 10 ...

Page 11: ...KE INSULATION FOLDING 2 3 If insulation was used begin takedown by rolling up all doors If additional shelters were connected reattach insulation endwalls at connected locations Disconnect insulation at all attachment points on the legs of the shelter Position yourself so you are on the interior of the shelter grip the hanging portion of the insulation and fold corners inwards ...

Page 12: ...AL CAUTION REMOVE LEGS LOWER SHELTER DRAIN INSTALLATION DRAIN PUMP INSTALLATION INSULATION REMOVAL SHELTER STRIKE 4 5 Once corners have been folded inwards roll up and tie off with provided straps REPEAT STEP 3 4 FOR EACH CORNER SEGMENT Lower shelter in halves one side at a time Using four 4 personnel lift two 2 corners and remove both sets of legs Lower shelter to ground Proceed to opposite half ...

Page 13: ... REMOVAL 6 7 Remove each pin and slide grommet off frame posts Starting at one side fold roof over itself in 18 24 folds Remove from frame and fold to fit case or bag Folding instructions are provided at Step 12 Disconnect insulation straps from corner joints BLACK ARROWS Disconnect insulation straps from arch sections WHITE ARROWS DO NOT DISCONNECT STRAPS AT PEAK OR INTERIOR RIDGE LINES ...

Page 14: ...C VERSION 1 02 13 FOLD INSULATION 8 Disconnect insulation straps from one interior ridgeline BLACK ARROWS Pull insulation underneath itself to create half fold with ridgeline still attached Disconnect final interior ridgeline WHITE ARROWS and fold insulation Folding instructions are provided on page 16 ...

Page 15: ...BAGS DISASSEMBLE FRAME PACK FOR REDEPLOYMENT DRAIN INSTALLATION DRAIN PUMP INSTALLATION DISASSEMBLE FRAME PACK FRAME Disassemble shelter frame in reverse order from set up Inspect segments for dirty broken or missing pieces Perform any necessary cleaning repairs or replacement before repacking frame for redeployment Lay out arch segment and nest two 2 legs on each side Place sec ond arch section o...

Page 16: ...OGIX COM DEPLOYEDLOGIX EMAIL SALES DEPLOYEDLOGIX COM P 541 357 5978 2021 DLX ENTERPRISES LLC VERSION 1 02 15 DRAIN INSTALLATION DRAIN PUMP INSTALLATION FOLD ENDWALL FOLD ROOF EXTERIOR FACING UP EXTERIOR FACING UP ...

Page 17: ...IX COM DEPLOYEDLOGIX EMAIL SALES DEPLOYEDLOGIX COM P 541 357 5978 2021 DLX ENTERPRISES LLC VERSION 1 02 16 DRAIN INSTALLATION DRAIN PUMP INSTALLATION FOLD FLOOR FOLD INSULATION INTERIOR FACING UP INTERIOR FACING UP ...

Page 18: ... Cut Filament to Width of Patch NOTE Heating is an option and normally not needed unless temperatures are below freezing 1 2 3 Cut patch 1 inch beyond all edges of the tear If using more than one patch overlap at least 1 inch Trim and round corners Peel back 1 2 inch of paper liner Position exposed edge allowing the patch to extend 1 inch beyond all edges of the tear Peel back the liner while appl...

Page 19: ...18 ...

Reviews:

Related manuals for ASAP-HUB