DLG E-BOX-48100R LFP Battery User Manual
15
refer to the following picture for the cascade connection. then, insert
the communication cable to the port according to the communication
protocol between batteries and ESS inverter.
1.
The host Link Port 0 must be kept free;
2.
The end slave Link Port 1 must be kept free;
Note: The system may not be able to communicate without following
the instructions.
6.4.5Activation
1. Before activation, check again if all cables are properly and
firmly connected, also make sure there is no short circuit and reverse