![Ditch Witch SK752 Operator'S Manual Download Page 50](http://html1.mh-extra.com/html/ditch-witch/sk752/sk752_operators-manual_2510014050.webp)
SK752 Operator’s Manual
Transport - 49
Haul
Haul
Load
1.
Start engine.
2.
Adjust throttle to low speed.
3.
Pull lift arm control to raise mount plate (and attachment) clear of trailer, but keep it low.
4.
Move unit to rear of trailer and align with ramps.
5.
Drive forward slowly to move unit onto trailer until tiedown position is reached.
6.
Push lift arm control to lower mount plate (and attachment) to trailer bed.
7.
Engage parking brake.
8.
Ensure that all controls are in neutral position.
9.
Turn ignition switch to STOP.
10. Tie down unit.
Crushing weight. If load falls or moves it could kill or crush
you. Use proper procedures and equipment or stay away.
To help avoid injury:
•
Load and unload trailer on level ground.
•
Incorrect loading can cause trailer swaying.
•
Attach trailer to vehicle before loading or unloading.
•
Only operate unit from operator platform.
•
To help prevent trailer sway, load trailer so that ten to fifteen percent of total vehicle weight
(equipment plus trailer) is on tongue.
•
If loading onto tilt-bed trailer, be prepared for trailer to tilt.
•
Move all controls to neutral position when stopped.
Summary of Contents for SK752
Page 1: ...SK752 Operator s Manual 053 2859 Issue 2 0 Original Instruction...
Page 11: ...Contents 10 SK752 Operator s Manual...
Page 21: ...Safety 20 SK752 Operator s Manual Machine Safety Alerts...
Page 31: ...Controls 30 SK752 Operator s Manual Attachment Plate...
Page 41: ...Prepare 40 SK752 Operator s Manual Connect Attachment...
Page 47: ...Drive 46 SK752 Operator s Manual Shut Down...
Page 55: ...Transport 54 SK752 Operator s Manual Retrieve...
Page 86: ......
Page 87: ......
Page 88: ...SK752 Operator s Manual Service Record 87 Service Record Service Performed Date Hours...
Page 89: ...Service Record 88 SK752 Operator s Manual Service Performed Date Hours...