SK650 Operator’s Manual
Transport - 43
Hau
CMW
Hau
Load
1.
Disengage parking brake.
2.
Start engine.
3.
Adjust throttle to low speed.
4.
Pull lift arm control to raise mount plate (and attachment) clear of trailer, but keep it low.
5.
Move unit to rear of trailer and align with ramps.
6.
Move both track drive controls forward and slowly move unit onto trailer until tiedown position is
reached.
7.
Push lift arm control to lower mount plate (and attachment) to trailer bed.
8.
Apply parking brake.
9.
Ensure that all controls are in neutral position.
10. Turn ignition switch to STOP.
11. Tie down unit.
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
NOTICE:
•
Load and unload trailer on level ground.
•
Incorrect loading can cause trailer swaying.
•
Attach trailer to vehicle before loading or unloading.
•
Ten to fifteen percent of total vehicle weight (equipment plus trailer) must be on tongue to help
prevent trailer sway.
NOTICE:
•
If loading onto tilt-bed trailer, be prepared for trailer to tilt.
•
Move all controls to neutral position when stopped.
Summary of Contents for SK650
Page 1: ...SK650 Tier 4i Operator s Manual 053 1293 Issue 2 0 Original Translation CMW...
Page 7: ...Overview 6 SK650 Operator s Manual About This Manual CMW...
Page 11: ...Contents 10 SK650 Operator s Manual CMW...
Page 21: ...Safety 20 SK650 Operator s Manual Emergency Procedures CMW...
Page 49: ...Transport 48 SK650 Operator s Manual Tow CMW...
Page 73: ...Service 72 SK650 Operator s Manual As Needed CMW...
Page 77: ...Specifications 76 SK650 Operator s Manual Basic Unit CMW...
Page 80: ......
Page 81: ......
Page 82: ...SK650 Operator s Manual Service Record 81 CMW Service Record Service Performed Date Hours...
Page 83: ...CMW Service Record 82 SK650 Operator s Manual Service Performed Date Hours...