Drill - 128
RT80Q Operator’s Manual
Finish Job
Finish Job
Disassemble Drill String
1. Shut down tractor.
2. Disconnect drill string from drilling
attachment.
3. Remove drill bit.
4. Disconnect sections:
•
Press tab through hole in female side
of joint (1) using special tool
(p/n 351-272).
•
Pull rod sections apart (2).
Remove Drilling Attachment
1. Disconnect hydraulic hoses if necessary.
2. If desired, remove drilling attachment from
backfill blade.
Summary of Contents for RT80Q
Page 1: ...RT80Q Tier 4 Operator s Manual 053 2708 Issue 2 0 ORIGINAL INSTRUCTION...
Page 7: ...Overview 6 RT80Q Operator s Manual About This Manual...
Page 67: ...Operation Overview 66 RT80Q Operator s Manual...
Page 91: ...Transport 90 RT80Q Operator s Manual...
Page 92: ...RT80Q Operator s Manual Trench 91 Trench Chapter Contents Set Up 92 Operate 94...
Page 98: ...RT80Q Operator s Manual Plow 97 Plow Chapter Contents Set Up 98 Operate 101...
Page 105: ...Plow 104 RT80Q Operator s Manual...
Page 106: ...RT80Q Operator s Manual Reel Carrier 105 Reel Carrier Chapter Contents Set Up 106 Operate 107...
Page 109: ...Reel Carrier 108 RT80Q Operator s Manual...
Page 114: ...RT80Q Operator s Manual Backhoe 113 Backhoe Chapter Contents Set Up 114 Operate 115 Stow 116...
Page 137: ...Systems and Equipment 136 RT80Q Operator s Manual Counterweighting...
Page 183: ...Service 182 RT80Q Operator s Manual As Needed...
Page 201: ...Specifications 200 RT80Q Operator s Manual RC80 Reel Carrier...
Page 204: ......
Page 205: ......
Page 206: ...RT80Q Operator s Manual Service Record 205 Service Record Service Performed Date Hours...
Page 207: ...Service Record 206 RT80Q Operator s Manual Service Performed Date Hours...