Drill - 108
RT45 Operator’s Manual
Prepare Jobsite and Equipment
Drill Rod and Equipment
1. Assemble at least 20’ (6 m), but not more than 30’ (9 m), of drill rod.
2.
Install drill bit to the cutting end of the drill string.
3.
Put drill string in approach trench.
4.
Move tractor to the approach trench and align the drilling attachment with the intended bore path.
5.
Turn off engine.
6. Attach drill string to drilling attachment.
NOTICE:
More than 10-15’ (3-4.5 m) of drill rod out of the trench increases the tendency of drill
rod to bend.
Summary of Contents for RT45
Page 1: ...RT45 Operator s Manual 053 1982 Issue 4 0 ...
Page 7: ...Overview 6 RT45 Operator s Manual ...
Page 70: ...RT45 Operator s Manual Drive 69 Drive Chapter Contents Start Unit 70 Drive 72 Shut Down 72 ...
Page 84: ...RT45 Operator s Manual Trench 83 Trench Chapter Contents Setup 84 Operation 85 ...
Page 99: ...Saw 98 RT45 Operator s Manual Operation ...
Page 105: ...Backhoe 104 RT45 Operator s Manual ...
Page 125: ...Microtrenching 124 RT45 Operator s Manual Operation ...
Page 136: ...RT45 Operator s Manual Service 135 Lubrication Overview Lubrication Overview ...
Page 175: ...Service 174 RT45 Operator s Manual As Needed ...
Page 193: ...Specifications 192 RT45 Operator s Manual MT12 MicroTrencher ...
Page 196: ......
Page 197: ......
Page 198: ...RT45 Operator s Manual Service Record 197 Service Record Service Performed Date Hours ...
Page 199: ...Service Record 198 RT45 Operator s Manual Service Performed Date Hours ...