![Dionex ASE 150 Operator'S Manual Download Page 116](http://html1.mh-extra.com/html/dionex/ase-150/ase-150_operators-manual_2506125116.webp)
ASE 150 Operator’s Manual
108
Doc. 065207-02 9/08
B.2 Installation Instructions
Before beginning the installation procedure, locate the ASE 150 Ship Kit
(P/N 066399). The Ship Kit contains several items required to install the system.
In addition, you will need an ASE 150 Startup Kit appropriate for the sample cell
size you plan to use. The following Startup Kits are available:
B.2.1
Connecting the Nitrogen Gas Source
1. Connect the 4-mm (0.156-in) elbow fitting (P/N 049272) to the
regulator on the nitrogen gas source.
2. Push one end of the blue 4-mm (0.156-in) OD tubing (P/N 049296)
into the elbow fitting.
3. Push the other end of the tubing into the
NITROGEN
connector on the
ASE 150 rear panel (see
ASE 150 Startup Kit
Part Number
Startup Kit for 1-mL, 5-mL, 10-mL, and 22-mL sample cells
068250
Startup Kit for 34-mL sample cells
068251
Startup Kit for 66-mL sample cells
068252
Startup Kit for 100-mL sample cells
068253
The nitrogen gas source connection on the ASE 150 rear panel
(see
•
To
connect
a press fitting, firmly push the tubing into the
fitting until it is seated.
•
To
disconnect
a press fitting, use your fingers (or a small
open-end wrench) to press the ring on the fitting
in
, while at
the same time pulling the tubing
out
.
Summary of Contents for ASE 150
Page 32: ...ASE 150 Operator s Manual 24 Doc 065207 02 9 08...
Page 64: ...ASE 150 Operator s Manual 56 Doc 065207 02 9 08...
Page 76: ...ASE 150 Operator s Manual 68 Doc 065207 02 9 08...
Page 114: ...ASE 150 Operator s Manual 106 Doc 065207 02 9 08...
Page 132: ...ASE 150 Operator s Manual 124 Doc 065207 02 9 08...