2. The settings for the two oven voltage switches on the ASE 100 rear
panel (see Figure B-2) must match the voltage from the power source
at the installation site.
Check that both switches are set to either 110 (for voltages between
100 and 120 Vac) or 220 (for voltages between 220 and 240 Vac). To
change the switch settings, insert a small screwdriver into the slot in
each switch and turn it to either 110 or 220.
NOTE The oven voltage switch settings have no effect
on system components other than the oven. The
ASE 100 main power supply adjusts
automatically to the power source at the
installation site.
Figure B-2. Oven Voltage Switches
Summary of Contents for ASE 100
Page 8: ...ASE 100 Accelerated Solvent Extractor vi Doc 031842 01 5 02...
Page 24: ...ASE 100 Operator s Manual 2 10 Doc 031842 01 5 02 Figure 2 4 ASE 100 Rear Panel...
Page 32: ...ASE 100 Operator s Manual 2 18 Doc 031842 01 5 02...
Page 42: ...ASE 100 Operator s Manual 3 10 Doc 031842 01 5 02 Figure 3 2 Inspecting Cell O Rings...
Page 60: ...ASE 100 Operator s Manual 3 28 Doc 031842 01 5 02...
Page 69: ...4 Troubleshooting Doc 031842 01 5 02 4 9 Figure 4 1 ASE 100 Plumbing Diagram...
Page 106: ...ASE 100 Operator s Manual 5 36 Doc 031842 01 5 02...
Page 110: ...ASE 100 Operator s Manual A 4 Doc 031842 01 5 02...
Page 113: ...B Installation Doc 031842 01 5 02 B 3 Figure B 1 ASE 100 Rear Panel...
Page 150: ...ASE 100 Accelerated Solvent Extractor Index 8 Doc 031842 01 5 02...