background image

7

EASY TO FOLLOW STARTING SEQUENCE

STEP 1

Open gas cap vent all of the way.

STEP 4

Move choke lever to CHOKE or 

ON position. 

NOTE:

 CHOKE position is defi ned by 

moving the choke lever as far to the ON 

position as possible.

STEP 7

Squeeze throttle trigger.

STEP 13

Pull the recoil starter until the engine 

starts.

STEP 14

Slide chock all the way to the run 

position.

STEP 15

To stop engine push rocker switch to 

‘OFF’ position.

STEP 2

Move choke lever to choke position.

STEP 5

Push rocker switch to the ON position.

STEP 8

Apply locking button for the open 

throttle position.

STEP 9

Push the primer four to fi ve times until 

you see fuel return down the clear tube.

STEP 10

Pull the decompression switch out.

STEP 11

Pull the recoil starter until the engine 

starts and stops.

STEP 2

Prime unit until primer hose is fi led 

with gas.

STEP 6

Squeeze top lever on throttle control.

STEP 12

Slide the choke to half position.

Summary of Contents for 65CC

Page 1: ...1 ...

Page 2: ...ings Check List Page 3 What Is In Your Box Assembly Page 4 Mixing Fuel Page 5 Operation Page 6 Starting Sequence Page 7 Warm Engine Start Maintenance and Storage Page 8 Air Filter Page 9 NOTE Extension Length May Vary Depending On Advertised Offer ...

Page 3: ... ADULTS TO OPERATE THE AUGER WITHOUT PROPER INSTRUCTION DO NOT OPERATE ANY POWER EQUIPMENT UNDER THE INFLUENCE OF ALCOHOL OR DRUGS KEEP ALL SCREWS NUTS AND BOLTS TIGHT ENGINE SHOULD BE TURNED OFF AND COOL SPARK PLUG WIRE MUST BE REMOVED FROM SPARK PLUG BEFORE ANY REPAIRS ARE ATTEMPTED TEMPERATURE OF MUFFLER AND NEARBY AREAS MAY EXCEED 150 DEGREES AVOID THESE AREAS NEVER RUN ENGINE INDOORS OR IN AN...

Page 4: ...4 WHAT IS IN YOUR BOX STANDARD COMPONENTS A Bolts and drop pins B Augers 200mm C Motor D1 Extension arms 800mm D2 Extension arms 800mm D3 Extension arms 800mm A A A B C D1 D2 D3 ...

Page 5: ...HINE IS IN OPERATION FOR THE BEST DINGO TOOLS PERFORMANCE YOU CAN EXPECT OUT OF YOUR DINGO TOOLS MACHINE 1 25 OIL 600 576 92 500 400 300 200 100 GASOLINE FULL 1 25 OIL 600 576 92 30 1 C 1 25 OIL 600 576 92 25 1 B A 1 25 25 25 25 25 5 25 5 OI O O O O O O O L L L L 600 576 92 57 57 7 7 7 57 7 76 6 6 92 92 92 9 9 500 25 AT ALL TIMES PLEASE KEEP THE FUEL TANK FULL WHEN IN OPERATION AVOID HAVING THE YO...

Page 6: ...eadly 4 Do not use an earth auger in the ice 5 To attach auger to powerhead align hole at top of auger shaft with the output shaft hole Insert 3 8 16x1 1 2 bolt and secure bolt with provided 3 8 bi way lock nut using a wrench NOTE The ends of the bolt should be flush with the auger collar Bolt head and thread end should never go beyond earth collar USING THE SCREW TYPE MANUAL VENTING GAS CAP 1 You...

Page 7: ...n position STEP 15 To stop engine push rocker switch to OFF position STEP 2 Move choke lever to choke position STEP 5 Push rocker switch to the ON position STEP 8 Apply locking button for the open throttle position STEP 9 Push the primer four to five times until you see fuel return down the clear tube STEP 10 Pull the decompression switch out STEP 11 Pull the recoil starter until the engine starts ...

Page 8: ...AN SPRAY OUT AND IGNITE FROM A SPARK FROM SPARK PLUG MAINTENANCE AND STORAGE AUGER MAINTENANCE 1 The gear case has 4 oz of grease installed at the factory It is recommended that once a year the gear case be split and the grease level checked Add grease only if level of grease is below top of the gears DO NOT OVERFILL 2 Keep all screws nuts and bolts tight 3 For cold weather operation store the uni...

Page 9: ... spark plug wrench CARBURETOR Never tamper with factory setting of the carburetor TRANSPORTING YOUR EARTH AUGER 1 Never transport engine inside an enclosed space of vehicle Fuel or fuel vapors may ignite causing serious injury or death 2 If fuel is present in the fuel tank transport in an open vehicle in an upright position 3 If an enclosed vehicle must be used remove gas into an approved red fuel...

Reviews: