7 Start-up

7.1 General

To ensure that start-up is performed correctly, it should only be
carried out by an after-sales service technician authorised by the
manufacturer. This may be a condition for extending the guaran-
tee (see Warranty Service).

7.2 Preparation

The following items need to be checked prior to start-up:

„

All connections of the hydraulic tower must be established
as described in chapter 6.

„

All valves that could impair the proper flow of the heating
water in the heating circuit must be open.

„

The settings of the heat pump controller must be adapted to
the heating system in accordance with the controller’s oper-
ating instructions.

7.3 Procedure

The hydraulic tower is started up via the heat pump controller.
Adjustments should be made in compliance with the instructions.
The operating overpressures indicated on the type plate must not
be exceeded.
Any faults occurring during operation are also displayed on the
heat pump controller and can be corrected as described in the
operating instructions of the heat pump controller.

8 Maintenance / Cleaning

8.1 Cleaning

To protect the paintwork, avoid leaning anything against the de-
vice or putting objects on the device. External heat pump parts
can be wiped with a damp cloth and domestic cleaner.

ATTENTION!

Never use cleaning agents containing sand, soda, acid or chloride as
these can damage the surfaces.

8.2 Cleaning the Heating System

The ingress of oxygen into the heating water circuit may result in
the formation of oxidation products (rust), particularly if steel
components are used. These products enter the heating system
via the valves, the circulating pumps and/or plastic pipes. It is
therefore essential - in particular with respect to the piping of un-
derfloor heating systems - that only diffusion-proof materials are
used.
Residue from lubricants and sealants may also contaminate the
heating water.
In the case of severe contamination leading to a reduction in the
performance of the liquefier in the heat pump, the system must
be cleaned by a heating technician.
According to current information, we recommend using a 5%
phosphoric acid solution for cleaning purposes. However, if
cleaning needs to be performed more frequently, a 5% formic
acid solution should be used.

In either case, the cleaning fluid should be at room temperature.
We recommend flushing the heat exchanger in the direction op-
posite to the normal flow direction.
To prevent acidic cleaning agents from entering the heating sys-
tem circuit, we recommend connecting the flushing device di-
rectly to the flow and return flow of the liquefier of the heat pump.
It is important that the system be thoroughly flushed using appro-
priate neutralising agents to prevent damage caused by cleaning
agent residue remaining in the system.
Acids must be used with great care and all relevant regulations of
the employers’ liability insurance associations must be adhered
to.
If in doubt, contact the manufacturer of the chemicals!

9 Faults / troubleshooting

This hydraulic power is a quality product and designed for trou-
ble-free and maintenance-free operation. In the event that a fault
should occur, it will be indicated on the heat pump manager dis-
play. Consult the Faults and Troubleshooting page in the operat-
ing instructions of the heat pump manager. If you cannot correct
the fault yourself, please contact your after-sales service techni-
cian.

ATTENTION!

Any work on the system may only be performed by authorised and
qualified after-sales service technicians.

10 Decommissioning / 

disposal

Before removing the hydraulic power, disconnect it from the
power source and close all valves. Observe all environmentally-
relevant requirements regarding the recovery, recycling and dis-
posal of materials and components in accordance with all appli-
cable standards. 

Summary of Contents for HPK 200S

Page 1: ...tower with HPM Tour hydraulique avec gestionnaire WPM Montage und Gebrauchsanweisung Deutsch English Fran ais Instructions d installation et d utilisation Installation and Operating Instructions Beste...

Page 2: ......

Page 3: ...t DE 3 3 2 Schaltkasten DE 3 3 3 W rmepumpenregler DE 3 4 Transport DE 3 5 Aufstellung DE 4 5 1 Allgemein DE 4 5 2 Schall DE 4 6 Montage DE 4 6 1 Allgemein DE 4 6 2 Heizungsseitiger Anschluss DE 4 6 3...

Page 4: ...sicher zu benutzen sollten dieses Ger t nicht ohne Aufsicht oder Anwei sung durch eine verantwortliche Person benutzen Kinder sollten beaufsichtigt werden um sicherzustellen dass sie nicht mit dem Ge...

Page 5: ...und kann durch L sen der beiden oben liegenden Befestigungsschrauben her ausgeklappt werden Im Schaltkasten befinden sich die Netzanschlussklemmen Hei zungssch tze Nabelschnuranschl sse Verbindungslei...

Page 6: ...schluss Die heizungsseitigen Anschl sse am Hydrauliktower sind mit 1 1 4 Au engewinde versehen Beim Anschluss muss an den berg ngen mit einem Schl ssel gegengehalten werden Bevor die heizwasserseitige...

Page 7: ...ler Die Einstellungen m ssen gem dessen An leitung vollzogen werden Die auf dem Typschild angegebenen Betriebs berdr cke d rfen nicht berschritten werden St rungen w hrend des Betriebes werden ebenfal...

Page 8: ...managers nach Wenn die St rung nicht selbst behoben werden kann verst ndigen Sie bitte den zust ndigen Kundendienst ACHTUNG Arbeiten an der Anlage d rfen nur vom autorisierten und sachkundigen Kunden...

Page 9: ...sprechdruck Sicherheitsventil bar 2 5 3 6 maximaler Betriebs berdruck bar 2 0 3 7 maximale Betriebstemperatur C 85 3 8 elektrische Rohrheizung kW 2 4 bzw 6 Tauchheizk rper kW bis 6 optional 3 9 Schall...

Page 10: ...DE 8 Deutsch 11...

Page 11: ...EN 3 3 2 Switch box EN 3 3 3 Heat pump controller EN 3 4 Transport EN 3 5 Set up EN 4 5 1 General EN 4 5 2 Sound EN 4 6 Installation EN 4 6 1 General EN 4 6 2 Heating System Connection EN 4 6 3 Electr...

Page 12: ...y or mental abilities or their inexperience or lack of knowledge must not operate this device without supervision or instruction by the person in charge Children must be supervised to ensure that they...

Page 13: ...osening the two top mounting screws it can be folded open The switch box contains the supply connection terminals heating contactors umbilical cable connections connecting line to the heat pump and th...

Page 14: ...start up must be carried out by a qualified specialist com pany The entire system including all factory assembled compo nents should be inspected to ensure that everything is working properly and that...

Page 15: ...als are used Residue from lubricants and sealants may also contaminate the heating water In the case of severe contamination leading to a reduction in the performance of the liquefier in the heat pump...

Page 16: ...ssure safety valve bar 2 5 3 6 max operating overpressure bar 2 0 3 7 max operating temperature C 85 3 8 electrical pipe heater kW 2 4 or 6 Immersion heater kW up to 6 optional 3 9 Sound power level d...

Page 17: ...FR 3 3 3 R gulateur de pompe chaleur FR 3 4 Transport FR 3 5 Installation FR 3 5 1 G n ralit s FR 3 5 2 Bruit FR 4 6 Montage FR 4 6 1 G n ralit s FR 4 6 2 Raccordement c t chauffage FR 4 6 3 Branchem...

Page 18: ...connaissances ne sont pas en mesure d utiliser l appareil en toute s curit ne devraient pas le faire en l absence ou sans instructions d une personne responsable Les enfants doivent tre surveill s pou...

Page 19: ...facile utiliser Il commande et surveille toute l installation de chauffage en fonction de la temp rature ext rieure ainsi que la production d eau chaude sanitaire et les dispositifs de s curit La son...

Page 20: ...ion diff rentielle Protection antigel Dans le cas de pompes chaleur expos es au gel il convient de pr voir ventuellement une vidange manuelle La fonction de protection antigel du r gulateur est activ...

Page 21: ...chauffage peut galement tre souill e par des r sidus de produits de lubrification et d tanch ification Si l encrassement est si fort que la puissance du condenseur de la pompe chaleur s en trouve r du...

Page 22: ...Surpression de service maximale bars 2 0 3 7 Temp rature de service maximale C 85 3 8 Chauffage tubes lectrique kW 2 4 ou 6 R sistance immerg e kW max 6 en option 3 9 Niveau de puissance sonore dB A 3...

Page 23: ...Anschlussplan Last Circuit diagram load Sch ma lectrique de charge A VII 3 5 Legende Legend L gende A VIII 4 Hydraulische Prinzipschemen Hydraulic Plumbing Diagrams Sch mas hydrauliques A X 4 1 Hydra...

Page 24: ...HU IORZ H WHUQDO WKUHDG RW ZDWHU UHWXUQ IORZ H WHUQDO WKUHDG OHFWULFDO FRQQHFWLRQ HDW UHWXUQ IORZ QSXW LQ 3 6 H WHUQDO WKUHDG HDW IORZ 2XWOHW IURP 3 6 H WHUQDO WKUHDG GGLWLRQDO FRQQHFWLRQ RI DQ H SDQV...

Page 25: ...HVW pTXLSp G XQH DGDSWDWLRQ pOHFWURQLTXH FRQWLQXH GX UHIRXOHPHQW UGHUK KH LQ P HOLYHU KHLJKW LQ P 5HIRXOHPHQW HQ P HL ZDVVHUGXUFKIOXVV LQ P K HDWLQJ ZDWHU IORZ UDWH LQ P K pELW G HDX GH FKDXIIDJH HQ P...

Page 26: ...pendix Annexes 3 3 Stromlaufpl ne Circuit Diagrams Sch mas lectriques 3 1 Steuerung Control Commande 7 9 9 12 12 12 5 7 5 7 1 1 95 9 WHUP 9 1 1 12 12 12 12 1 12 12 12 12 1 12 1 12 1 1 1 5 G 1 0 1 1 3...

Page 27: ...A V Anhang Appendix Annexes 3 2 3 2 Last Load Charge...

Page 28: ...rcuit diagram control Sch ma lectrique de commande 7 3 9 9 12 12 12 5 7 5 7 1 1 95 9 WHUP 9 1 1 12 12 12 12 1 12 12 12 12 1 12 1 12 1 1 1 5 G G 5 5 G G 5 7 7 1 0 0 0 0 1 5 G 1 3 1 3 9 7U 7U 0 1 7 7 1...

Page 29: ...A VII Anhang Appendix Annexes 3 4 3 4 Anschlussplan Last Circuit diagram load Sch ma lectrique de charge...

Page 30: ...50 Hz J2 Anschluss f r Warmwasser R cklauf und Aus senf hler Connection for hot water sensor return flow sensor and external sensor Connexion des sondes sur circuit d eau chaude sanitaire sur circuit...

Page 31: ...erheitstrenntransformator 230 24 VAC 28VA Safety isolating transformer 230 24 V AC 28 VA Transformateur sectionneur de s curit 230 24 V AC 28 VA W1 Steuerleitung 15polig Control line 15 pole Ligne de...

Page 32: ...4 Hydraulische Prinzipschemen Hydraulic Plumbing Diagrams Sch mas hydrauliques 4 1 Hydrauliktower monoenergetische Betriebsweise Hydraulic tower mono energy operating mode Tour hydraulique en mode mon...

Page 33: ...ng und gemischtem Heizkreis Hydraulic tower bivalent operating mode optionally with DHW preparation and mixed heating circuit Tour hydraulique en mode bivalent en option avec production d eau chaude s...

Page 34: ...9 Flanschheizung Warmwasser Flange heater hot water Cartouche chauffante eau chaude sanitaire E10 1 Tauchheizk rper Immersion heater R sistance immerg e E10 2 l Gaskessel Oil gas boiler Chaudi re fuel...

Page 35: ...A XIII Anhang Appendix Annexes 4 3...

Page 36: ...sales service addres ses please refer to the Installation and Operating Instructions for Heat Pumps Pour les conditions de garantie et les adresses SAV se r f rer aux instructions de montage et d tili...

Reviews: