Tools and Materials required for the Installation
Tools required fort he Installation
3
Preproofer
–
HW Installation manual
3-3
Preproofer IM749
8-12 EN
3
Tools and Materials required for the Installation
3.1
Tools required fort he Installation
•
Standard Screwdriver set
•
Allen keys set
•
Set of spanners 10-15 mm
•
Phillips Screw driver set
•
Measurement Tape
•
Cordless drill to unpack the boxes
•
wrench
3.2
Materials required for the Installation
•
Local Power cord (not supplied)
•
Serial cable to connect the ShuffleBox the PC (not supplied)
3.3
Unpacking the Boxes
Make sure the following parts are available, after unpacking the cases:
Large case:
•
2 side Legs
•
2 Shelves
•
2 or 3 Cross beams
•
2 side media guides for roll media
•
Power supply with international plug
•
Software package with hardware dongle
•
Bag if screws, rectangular End plugs, circular end plugs, Printer locking devices
Small case:
•
Curver
•
1 anti-curling rod
•
Upper media deflector
•
Shuf Control panel wires + Y-motor wires
All packaged items must be inspected at the customer's site before unpacking begins. The following steps are
taken when there has been damage:
1.)
Record the observations on the delivery documentation.