background image

Q u i c k  S t a r t  G u i d e 

 

54-Port 10G Top-of-Rack Switch

 

DG-CS4554F

 

 

1. Unpack the Switch and Check Contents

 

 
 
Rack Mounting Kit

—contains two brackets and 

eight screws 

 

Power Cord - included with AC PSUs only 

 

   

Grounding Wire (included with DC PSUs only) 

 

   

Console Cable

—RJ-45 to DB-9 

Documentation

Quick Start Guide 

(this 

document) 

  

 

Caution: 

The switch includes two plug-in AC or DC 

PSUs and five fan tray modules that are installed into its 
chassis. All installed modules must have a matching 
airflow direction. That is, all modules must have a front-
to-back (F2B) airflow direction, or all modules must 
have a back-to- front (B2F) airflow direction. The airflow 
direction of PSU and fan tray modules is indicated by 
labels on the modules. 

 

 

2. Mount the Switch

 

3. Ground the Switch

 

 

 
 

 
 
 

 

 

 

 
 

Ensure the rack is properly grounded and in compliance 
with ETSI ETS 300 253. Verify that there is a good 
electrical connection to the grounding point on the rack 
(no paint or isolating surface treatment). 

 

Attach a lug (not provided with AC PSUs) to an 18 AWG 
minimum grounding wire (not provided with AC PSUs), 
and connect it to the grounding point on the switch rear 
panel. Then connect the other end of the wire to rack 
ground. 

 

Caution: 

The earth connection must not be 

removed unless all supply connections have been 
disconnected. 

 

 

4. Connect Power

 

 
 

 

 

Install one or two AC or DC power modules in the switch. 
The switch supports up to two PSUs that must have 
the same matching airflow direction as the installed 
fan tray. 

 

Connect an external AC or DC power source to the 
modules. 

 

5. Verify Switch Operation

 

 

 

 

Attach the brackets to the switch. 

 

Use the screws supplied with the rack to secure the 
switch in the rack. (The switch can also be installed a 
21 inch Open Rack using an Open Rack Switch 
Adapter.) 

 

Caution: 

Installing the switch in a rack requires two 

people. One person should position the switch in the 
rack, while the other secures it using the rack screws. 

 

 

 

 
 

 

Verify basic switch operation by checking the system LEDs. 
When operating normally, the PSU1/PSU2, Diag, 
and Fan LEDs should all be on green. 

 

 

 

 

–  1 

 

 