Chapter 6: Starting Up and Configuring Control|24
35
Chapter 6: Starting Up and Configuring
Control|24
Starting Up and Shutting
Down a System
Pro Tools systems components must be turned
on and shut off in a specific order.
Start your Pro Tools System in this order:
1
Turn on external hard drives. Wait 10 to 15
seconds for them to come up to speed.
2
Turn down or mute monitor levels on Con-
trol|24 to avoid loud sounds on power up.
3
Turn on Control|24.
4
Turn on any MIDI interfaces and other MIDI
devices.
5
Turn on audio interfaces.
6
Turn on the computer.
7
Turn on the monitoring amplifier and speaker
system.
Shut down Pro Tools in this order:
1
Turn off the monitoring amplifier and speaker
system.
2
Turn off audio interfaces.
3
Shut down the computer.
4
Turn off MIDI interfaces and other MIDI de-
vices.
5
Turn off Control|24.
6
Turn off external hard drives.
Software Installation
The Pro Tools Installer automatically installs all
Control|24 software as part of a normal installa-
tion. If you have not yet installed Pro Tools, re-
fer to the
Getting Started Guide
that came with
your system.
Power down your monitor system, and
make sure the levels are all the way down
on your amplifiers before turning Con-
trol|24 on or off. A loud pop can occur dur-
ing power cycling that could possibly dam-
age playback systems.
Summary of Contents for Control 24
Page 1: ...Control 24 ...
Page 4: ......
Page 11: ...1 Part I Introduction ...
Page 12: ...2 ...
Page 20: ...Control 24 Guide 10 ...
Page 21: ...11 Part II Analog Connections ...
Page 22: ...12 ...
Page 42: ...Control 24 Guide 32 ...
Page 43: ...33 Part III Control 24 Basics ...
Page 44: ...34 ...
Page 62: ...Control 24 Guide 52 ...
Page 82: ...Control 24 Guide 72 ...
Page 94: ...Control 24 Guide 84 ...
Page 95: ...85 Part IV Applications ...
Page 96: ...86 ...
Page 110: ...Control 24 Guide 100 ...
Page 136: ...Control 24 Guide 126 ...
Page 140: ...Control 24 Guide 130 ...
Page 152: ...Control 24 Guide 142 ...