Dielectric TLP-16 Instruction Manual Download Page 1

March 2010. Rev 0 
5 September, 2013. Rev 1 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 

Dielectric LLC 

22 Tower Road 

 

 

 

 

 

 

 

 

 

Raymond, ME 04071 

 

 

 

 

 

 

 

 

Phone: 800.341.9678 

TV LOW POWER 

ANTENNA 

INSTRUCTION MANUAL 

 

Summary of Contents for TLP-16

Page 1: ...1 March 2010 Rev 0 5 September 2013 Rev 1 Dielectric LLC 22 Tower Road Raymond ME 04071 Phone 800 341 9678 TV LOW POWER ANTENNA INSTRUCTION MANUAL...

Page 2: ...1 Return Policy 1 Factory Tests 1 Description 1 Uncrating 2 Assembly Installation Notes 3 A TLP 8 Assembly and Orientation 4 B TLP 16 24 32 Assembly and Orientation 4 C Leak Testing 5 D Purging 6 E Pr...

Page 3: ...emote controls disabled Return Policy When returning any material to the factory be sure to call your sales representative or customer service support and obtain a material return authorization MRA nu...

Page 4: ...und damaged promptly notify the carrier Shipping crates may be used to return damaged parts Antenna Sections Antenna sections are crated individually fully assembled with hardware and O rings Transmis...

Page 5: ...es not get onto contact surfaces Also to prevent arcing and air leaks ensure not to pinch an O ring between the flange contact surfaces Sufficient quantities of O rings and silicon dielectric lubrican...

Page 6: ...ld be set as specified Antenna sections are not the same do not interchange the sections from their designated order A TLP 8 Assembly and Orientation 1 Assemble mounts Reference Universal Mount drawin...

Page 7: ...porting structure to eliminate damage Use the wrap lock clamps to fasten the lines to the tower legs diagonals and horizontals or support mast C Leak Testing After the antenna is installed and all tra...

Page 8: ...f the main components in transmission line and antenna systems Ammonia makes the brass more susceptible to stress corrosion cracking 8 Correct any leaks that are found 9 Repeat steps 2 thru 5 D Purgin...

Page 9: ...Inspection Before powering the system perform the following inspection 1 Antenna system has been installed per the installation drawing s 2 The system is gas tight and purged 3 If an antenna checkout...

Page 10: ...dware for tightness Observe the dry nitrogen gas dehydrated compressor air usage as an indication for system leaks Note Whenever the system has been open for repair purge with dry nitrogen gas or dehy...

Page 11: ...ILLUSTRATIONS Installation Drawing See Information Folder Universal Mount Drawing See Information Folder Optional Ice shield drawing See Information Folder Torque Specification...

Page 12: ......

Reviews: