Dickson PB-101 Instructions For Operation And Care Download Page 8

Instructions for Operation and Care of Dickson Paraffin Baths

WHITEHALL MANUFACTURING

 • P.O. BOX 3527 • City of Industry, CA 91744-0527 U.S.A

Phone (800) 782-7706 • (626) 968-6681 • Fax (626) 855-4862 • Web: www.whitehallmfg.com

8

CLEANING THE BATH

Often Paraffin Baths are not cleaned as regularly as their 
use  warrants.  Whitehall  Manufacturing  now  prepares  an 
economical refill kit.

To  daily  sanitize  the  Bath,  as  previously  mentioned,  the 
melting circuit timer or switch should be placed in the “on” 
position for approximately 55 minutes. This will raise the 
Bath  temperature  above  200°F  (93.3°C)  and  effectively 
sanitize the Bath.

If there is a noticeable amount of sediment in the bottom of 
the  Bath,  all  the  paraffin  must  be  removed  for  proper 
cleaning.  Therefore,  periodically,  the  Bath  should  be 
drained completely of the paraffin solution and the bottom 
of  the  Bath  and  the  plexiglas  slats  (these  slats  are  only 
available  on  models  PB-104  and  PB-105)  cleaned 
thoroughly.

For this purpose, your Bath is supplied with a hollow drain 
ring  (only  available  on  models  PB-104  and  PB-105)  that 
can be placed in the drain opening and which rises about 
half an inch above the bottom of the drain.  In this manner 
the clean paraffin can be drained into a container and the 
sediment will remain in the bottom of the Bath.

After this is done, the Bath should be disconnected from the 
electrical outlet and the drain ring removed. The sediment 
and sludge may then be drained, the bottom flushed and 
the slats cleaned.

The clean paraffin in the container should still be in a liquid 
state and can readily be returned to the Bath. Reconnect 
the cord to the electrical outlet and the Bath will soon be 
ready again for the patient's use.

This operation removes 1 to 3 pounds (0.45 to 1.36 kg) of 
paraffin  from  the  solution  and  it  should  be  replaced  by 
adding fresh paraffin and oil to the bath.

CHANGING THE FUSE

Turn the Dickson Paraffin unit off via the controls on the 
front panel and then unplug the unit.

Next, position the unit to allow access to the rear of paraffin 
bath.  Locate the fuse holders at rear of the unit.

Depress the fuse holder caps with the use of a “common” 
blade screwdriver or fingers and rotate counterclockwise 
approximately 90° or until the cap becomes loose. Remove 
the fuse holder cap, exposing the glass fuse.  Remove the 
blown fuse.

Once the old fuse has been removed, replace it with a new 
fuse of the same type and amperage. Re-install the fuse 
holder  cap  by  depressing  and  rotating  clockwise 
approximately 90° and ensure that the fuse holder caps are 
secured. Turn the unit on via plugging it in to an electrical 
outlet.  Allow  the  wax  to  warm  up  to  the  operating 
temperature and use as required.

PARAFFIN REFILLS

Whitehall  Manufacturing  can  provide  refill  paraffin  wax 
(Paraffin Oil sold separately and can be purchased through 
your therapy products dealer). If the factory paraffin is not 
used and the paraffin is purchased elsewhere, it is most 
important  that  126°F  (52.2°C)  melting  point  paraffin  be 
obtained. If this is not done, the Bath will not operate at a 
high enough temperature to keep the paraffin liquid or, if 
adjusted  to  overcome  this,  will  be  too  hot  for  use  by  all 
except the strongest patients.

Summary of Contents for PB-101

Page 1: ...9 000 July 2012 INSTRUCTIONS FOR OPERATION AND CARE OF INSTITUTIONAL PARAFFIN BATH MODELS PB 101 PB 107 PB 104 PB 105 P O Box 3527 City of Industry CA 91744 0527 U S A q PB 101 q PB 101B q PB 107B q P...

Page 2: ...l Descriptions for PB 104 PB 105 5 Directions for Operating 6 Directions for Adjusting Maintenance or Treatment Circuit Switch 7 Directions for Treatment 7 Cleaning the Bath 8 Changing the Fuse 8 Para...

Page 3: ...imed Melting or Sanitizing Temperature Circuit Found on models PB 104 PB 105 PB 107 only The DICKSON Bath is the only bath having a timed hi heat circuit This simply allows the melting of the paraffin...

Page 4: ...tructions for Operation and Care of Dickson Paraffin Baths 4 DICKSON PARAFFIN BATH MODEL PB 101 DICKSON PARAFFIN BATH MODEL PB 107 High Heat Sanitizing Indicator Light Tank Low Heat Treatment Temperat...

Page 5: ...ions for Operation and Care of Dickson Paraffin Baths 5 DICKSON PARAFFIN BATH MODEL PB 104 DICKSON PARAFFIN BATH MODEL PB 105 High Heat Sanitizing Indicator Light Low Heat Treatment Temperature Indica...

Page 6: ...dual patient turn on the high heat knob until the thermometer shows the desired temperature As a rule with the high heat knob switched on and the bath covered the temperature will rise 1 F 0 55 C per...

Page 7: ...for 10 to 20 minutes or longer The glove of adhering paraffin should then be removed discarded and massage and re education of the member instituted The skin remains soft pliable and moist when this t...

Page 8: ...raffin in the container should still be in a liquid state and can readily be returned to the Bath Reconnect the cord to the electrical outlet and the Bath will soon be ready again for the patient s us...

Page 9: ...kers kick out when paraffin bath is plugged in If fuses in paraffin bath did not also blow out there is too much load on breaker Try another electrical outlet 2 Fuses blow when plugged in There is a d...

Page 10: ...x 10 6902 330 000 Element Heating 220V x 11 6902 438 000 Element Heating 120V x 12 6902 439 000 Element Heating 220V x 13 0710 230 001 Fuse Holder Cap x x x x x x x x 14 6902 132 000 Fuse 4 Amp x x x...

Page 11: ...x 29 220 V Power Cord Assembly 220V x x 30 6902 270 001 Resistor Assembly 3K 120V x 31 6902 271 001 Resistor Assembly 12K 220V x 32 6902 370 001 Resistor Assembly 3K 120V x 33 6902 371 001 Resistor As...

Page 12: ...raffin Baths WHITEHALL MANUFACTURING P O BOX 3527 City of Industry CA 91744 0527 U S A Phone 800 782 7706 626 968 6681 Fax 626 855 4862 Web www whitehallmfg com 12 24 1 44 26 22 17 40 38 13 39 25 23 4...

Page 13: ...n Baths WHITEHALL MANUFACTURING P O BOX 3527 City of Industry CA 91744 0527 U S A Phone 800 782 7706 626 968 6681 Fax 626 855 4862 Web www whitehallmfg com 13 24 1 44 26 22 17 40 14 13 47 25 23 46 7 4...

Page 14: ...ths WHITEHALL MANUFACTURING P O BOX 3527 City of Industry CA 91744 0527 U S A Phone 800 782 7706 626 968 6681 Fax 626 855 4862 Web www whitehallmfg com 14 DICKSON PARAFFIN BATH MODEL PB 104 46 33 20 1...

Page 15: ...hs WHITEHALL MANUFACTURING P O BOX 3527 City of Industry CA 91744 0527 U S A Phone 800 782 7706 626 968 6681 Fax 626 855 4862 Web www whitehallmfg com 15 38 28 13 16 29 18 20 47 17 19 21 46 42 5 3 44...

Page 16: ...91744 0527 U S A Phone 800 782 7706 626 968 6681 Fax 626 855 4862 Web www whitehallmfg com 16 FUSE FUSE BLU BRN YEL GRN BLU BRN GND POWER INLET L N HEATING ELEMENT THERMOSTAT RED LIGHT TIMER CONTROL...

Page 17: ...A Phone 800 782 7706 626 968 6681 Fax 626 855 4862 Web www whitehallmfg com 15 FUSE FUSE BLU BRN YEL GRN BLU BRN GND POWER INLET L N HEATING ELEMENT THERMOSTAT RED LIGHT TIMER CONTROL GREEN LIGHT L200...

Page 18: ...A Phone 800 782 7706 626 968 6681 Fax 626 855 4862 Web www whitehallmfg com 16 HEATING ELEMENT THERMOSTAT TWIST ON TERMINAL COMMON LOW BLK WHT WHT WHT WHT FUSE FUSE BRN BLU YEL GRN WHT WHT GND POWER I...

Page 19: ...A Phone 800 782 7706 626 968 6681 Fax 626 855 4862 Web www whitehallmfg com 15 HEATING ELEMENT THERMOSTAT TWIST ON TERMINAL COMMON LOW BLK WHT WHT WHT WHT FUSE FUSE BRN BLU YEL GRN WHT WHT GND POWER I...

Page 20: ...s mishandling or improper care or abnormal use The repair or replacement of the defective materials shall constitute the sole remedy of the Buyer and the sole remedy of Whitehall under this warranty W...

Reviews: