Core Bore Drilling Machine

333 Prospect St.

,

E

lyria, Ohio 44035

(216) 323-4616 •
Fax: (216) 323-8689

Customer Service:
1-800-321-5336

Customer Service Fax:
1-800-634-4035

Core Bore

Drilling Machine

Figure 2

.

Vacuum Motor and Base

.

Vacuum Anchor Method-to-Floor

Warning: DO NOT use the Vacuum Anchor Method-

to-Wall.

The

Vacuum Anchor Method

i

s

r

ecommended for

8-i

n

c

h

diameter holes or less. The Anchor Vacuum Method is NOT

r

ecomme

nd

ed

on

rou

gh

or

c

racke

d

floor conditions

,

holes

deeper

than one bit

length

,

steel concentrat

i

o

n

greater than

s

t

a

n

dard rebar

1

.

Turn

Machine on its back and

in

sert Vac

uum

Seal (Fig

.

3)

under Machine

B

ase, inspecting

first

to

en

s

ure

Seal is

in

goo

d

condit

i

on a

nd

seali

ng

g

r

oove

i

s c

le

an

.

2

.

Turn Drilling Machine

up

-r

i

g

ht

an

d

loose

n

4 Base

Leveling

Screws

.

3.

Plu

g Service

Cord

into

a

properly

gro

un

ded

recep

t

acle a

nd turn

Vacuum

Pum

p

ON/OFF

Sw

it

ch

to

the

ON position.

4

.

In

sert

Vacuum Slot Cap into Anchor Bolt

Slot (Fig

2) and check

vacuum

and

hose

connections

.

Vacuum

Gauge

(

F

ig

.

2)

mu

st read a

minimum

of

20 inches of

mercury

.

5

.

Th

e

Dr

i

ll

ing

Machine

shou

ld n

ow

be

vac

uu

m anchored

.

I

f

Machine does

not anchor

,

add

weight by

standing on Vac

uum Ba

se

.

It

s

houl

d

now

a

n

chor

with Vacuum

Gaug

e

reading

20

inches of

mer

-

cury

min1mum

.

I

f

not

,

c

h

eck the

floor

a

nd

Vacuum

Seal (Fig

.

3)

for leaks

.

6

Adjust

4 Leve

lin

g Sc

r

ew

s

to e

limin

ate rocki

n

g and

to

s

tabiliz

e

Machine

a

n

d p

lumb

Mast

.

The

Mach

in

e is now

ready to

dri

ll

.

1

Summary of Contents for Core Bore

Page 1: ...chine Base inspecting first to en sure Seal is in good condition and sealing groove is clean 2 Turn Drilling Machine up right and loosen 4 Base Leveling Screws 3 Plug Service Cord into a properly grou...

Page 2: ...ng Bit Fig 5 onto Drill Spindle Fig 4 and tighten securely with Bit Wrench Caution Never turn Drill on with Bit resting on the concrete ceiling 2 Check hole alignment by lowering Drill until it is abo...

Page 3: ...v A W G Cord Length Wire Size Base Anchor vacuum 81 12 X 11 Mast 11f2 sq X 34 Specifications common to all three Power Source 30 amp 115 vac 60HZ Drill Motors AII motors are 115 volt 60HZ Single phase...

Page 4: ...on cord Allvisitors should be kept at a safe distance from work area 10 Don t force tool Drill should be used at a speed and feed rate that does not overload the motor When starting Bits do not use mo...

Page 5: ...ing will cause chatter of Bit against the work sur face fracturing diamonds Bit may also bind in hole causing damage to the Bit The methods for anchoring are as follows follows Bolt Anchor Method to F...

Page 6: ...4 inches per minute may be achieved in concrete depending on material and Bit diameter Proper teed pressure is determined by load on motor and reading on Amp meter To maximize lite of Drill Bit regula...

Page 7: ...until tree the surface being drilled do not use more than two 12 inch Bit Extension Rods 1 Drill to full depth of Bit 2 Back Drill out and remove Bit and core 3 Put Drill Bit back into hole and connec...

Page 8: ...walls Note When it is necessary to raise the Drill Bit above Maintenance Instructions Warning Make sure Machine is unplugged from power source before making any adjustment Note If any maintenance is...

Page 9: ...arranty is limited to replacement or repair of defective parts at Diamond Products Elyria Ohio factory or at a point designated by it of such parts as shall appear to us upon inspection at such point...

Reviews: