IMG 1010 Quick Start Guide
Connecting TDM Signaling and Bearer Ports
•
The Bearer ports (Interface Offsets) 0-27 are connected to the TDM network. Each
Bearer Port can have signaling and bearer channels configured on it.
•
The Signaling/Timing Ports are connected to the TDM network, and can also be used
for signaling and bearer traffic the same as the Bearer ports. See the ‘T1/E1’ under
the ‘Configuration’ section in the online help for more information.
•
SS7 Signaling links and ISDN D-channnels can be brought in over either the
Signal/Timing Ports or the Bearer Ports. See ‘signaling’ under the ‘Configuration’
section in the Online Documentation for more information.
Starting ClientView to start Configuring Switch
Once the IMG 1010 has software installed, the cabling is connected, and the GCEMS
server has been configured, the ClientView application can be used to configure the
system. Below are a few topics from the Online Documentation to get started on
configuring the IMG 1010 through the ClientView GUI.
•
Configuration > ClientView > (All topics under this book)
•
Configuration > Introduction
•
Configuration > Node Configuration Wizard
•
Configuration > Basic Configuration
From here, the IMG 1010 can be configured for your network. Use the Online Manual
Configuration, Clientview, and ClientView Pane sections to configure the IMG 1010.
Dialogic Corporation
Part # 07-8728-04
Page 9 of 9