background image

 

  

 

 

Elskensakker 8, NL-5571 SK 

 

Bergeijk, The Netherlands 

 
 

Tel   

+31 497 542 527 

 

Fax  

+31 497 555 399 

 

E-mail 

[email protected] 

 

Web 

www.dhatec.nl 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Rev. 

Date 

Status 

Prepared By 

Approved By 

 

00 

03-04-2018 

Released 

Daan Neutkens 

Martijn Bayens 

01 

10-08-2018 

Released 

Daan Neutkens 

Clovis Kouamé 

02 

23-01-2018 

Released 

Bas Coenen 

Martijn Bayens 

03 

12-02-2018 

Released 

Bas Coenen 

Martijn Bayens

 

04 

02-04-2019 

Released 

Bas Coenen

 

Martijn Bayens 

 

 

 

 

 

©Dhatec B.V. The following document shall be considered as copyright and the design right reserved. Copying and/or disclosure of the information 
contained within the following document to any third-party, other than specifically for the purpose of the project is forbidden without prior written 
permission of the proprietor.

 

 

Application Procedure Specification Dhatec V-Sup 

 

Dhatec Document No.: DHA415

-

APS-VS 

 

Summary of Contents for V-Sup

Page 1: ...jn Bayens 03 12 02 2018 Released Bas Coenen Martijn Bayens 04 02 04 2019 Released Bas Coenen Martijn Bayens Dhatec B V The following document shall be considered as copyright and the design right rese...

Page 2: ...ur knowledge correct at the date of publication However Dhatec B V cannot be held responsible for consequences that follow from the claims that were made in this document Do not carry out any repairs...

Page 3: ...support pipes during construction activities Supporting these pipes is not without risks If the pipes are not handled and supported carefully serious damages or injuries can occur The purpose of this...

Page 4: ...e 90 C 194 F User actions Before installing a V Sup stack subject the parts to an extensive visual inspection and discard the parts that show product failures chapter A 2 The V Sup beams must be free...

Page 5: ...be found in the following paragraphs of this chapter A General instructions for V Sup A 1 Equipment A 2 Product check B Installation of the V Sup B 1 Preparation of construction location B 2 Installat...

Page 6: ...ing This means two beams will be placed directly on the ground after which a pipe can be placed on top of them The V Sup is capable of supporting pipes up to 2032 mm 80 A pipe has to be supported by a...

Page 7: ...safe way check all products before using them Do that by looking at the next points The beams should always be able to lock into each other without any problems The beams should not show signs of exte...

Page 8: ...cles such as wood stones gravel or any other obstacles To ensure a safety envelop large enough the use of the V sup is recommended within a temperature window of 30 C up to 45 C 22 F to 113 F Step B 2...

Page 9: ...he V Sup stack are free of ice snow oil mud algae or any other substances that have a negative influence on the friction Make sure the V beam is free of ice snow oil mud algae or any other substances...

Page 10: ...ure the surface on which the V Sup will be installed is free of obstacles such as wood stones gravel or any other obstacles Make sure the minimum and maximum operating temperatures of respectively 30...

Page 11: ...ure the V Sup stacks are loaded carefully The V Sup can be loaded with all different lifting equipment hooks reach stacker vacuum lifter slings etc Make sure that during the lifting and loading proced...

Page 12: ...12 Guidelines to check if V Sup is used properly Figure 15 Contamination in recesses Figure 13 Unevenness in terrain Figure 12 Correct V Sup stack Figure 14 Beams on their sides...

Page 13: ...13 Figure 16 V Beam in outer recesses Figure 16 Correct V Sup Stack Figure 17 Beams placed next to recesses Figure 18 Stackable Beam left out of the stack...

Reviews: