DeZURIK, Inc. Sartell, Minnesota USA | Phone: 320-259-2000 |
www.dezurik.com
| [email protected]
WILLAMETTE VMC-2200
CONE VALVES
Instruction
D12002
February 2015
Page 1: ...DeZURIK Inc Sartell Minnesota USA Phone 320 259 2000 www dezurik com info dezurik com WILLAMETTE VMC 2200 CONE VALVES Instruction D12002 February 2015...
Page 2: ...rom service with suitable protection for any potential pipeline material in the valve Inspection Your Willamette VMC 2200 Cone Valve has been packaged to provide protection during shipment however it...
Page 3: ...ontents Description 4 Handling and Storage 4 Installation 5 Fusion Powder Coated Valves 5 Maintenance 6 General 6 Lubrication 6 Valve Assembly 18 Larger 6 Torque Unit 6 Shaft Packing Adjustment 7 Shaf...
Page 4: ...hout shutdown of the pipeline The operator is equipped with an external valve position indicator Bearings are provided on the top and bottom of the plug to fully support the plug away from the body se...
Page 5: ...the installation and eliminate any distortion to the valve body Ensure the valve and pipeline flanges are concentric to ensure proper flange sealing and seat leakage control Tighten the flange bolts...
Page 6: ...he valve body and cover is fitted with two lubrication points for the lower and upper body bushings Lubricate at the Upper Bushing Grease Point on the cover and the Lower Bushing Grease Point located...
Page 7: ...disconnect and lock out the pneumatic hydraulic or electrical power to prevent accidental operation of the actuator Accidental operation of power actuator can cause personal injury or equipment damag...
Page 8: ...ate or open position 2 After the valve has been moved to either an intermediate or open position power down disconnect and or lockout any electric hydraulic or pneumatic power to prevent accidental op...
Page 9: ...DeZURIK Willamette VMC 2200 Cone Valves February 2015 Page 9 D12002 Drawings Figure 1 Valve Assembly...
Page 10: ...DeZURIK Willamette VMC 2200 Cone Valves D12002 Page 10 February 2015 Drawings Continued Figure 2 Torque Unit Assembly Detail...
Page 11: ...DeZURIK Willamette VMC 2200 Cone Valves February 2015 Page 11 D12002 Drawings Continued Figure 3 T8 9 Torque Unit Assembly Detail Figure 4 Packing Detail...
Page 12: ...g Blown flange gasket Replace flange gasket Miss alignment or damage to field piping and supports Adjust miss alignment or repair piping or supports Damaged flange face s or improper flange connection...
Page 13: ...l be the only effective guarantee or warranty binding on Seller despite anything to the contrary contained in the purchase order or represented by any agent or employee of Seller in writing or otherwi...