600W Mounting
Installation/User Manual
9
Installation Procedures
Step 1 - Install the AC branch circuit junction box
a. Install an appropriate junction box at a suitable location on the PV
racking system (typically at the end of a branch of modules).
b. Connect the open wire end of the AC cable into the junction
box using an appropriate gland or strain relief fitting.
c. Wire the conductors
of the AC
: L - RED; N - BLAC
K
; PE - YELLOW GREEN.
d. Connect the AC branch circuit junction box to the point of utility
Interconnection.
WARNING:
Wiring colour code can be different according local regulation,
check all the wires of the installation before connecting to the AC cableto be
sure they match.Wrong cabling can damage irreparably the microinverters,
such an issue is not covered by the warranty.
Step
2
-
Attach
the
Microinverters
to
the
racking
or
the
PV
module
frame
a.
Mark
the
location
of
the
Microinverter
on
the
rack,
with
respect
to
the
PV
module
junction
box
or
any
other
obstructions.
b.
Mount
one
Microinverter
at
each
of
these
locations
using
hardware
recommended
by
your
module
racking
vendor.
1300W Mounting