background image

- 32 -

5.8 Grid Setup Menu

For California only.

Grid Setting

Grid Mode

Grid Type

General Standard
UL1741

IEEE1547

CPUC RULE21
SRD-UL-1741

120/240V Split Phase
120/208V 3 Phase
120V Single Phase

220V Single Phase

Grid

Set1

PF

Grid Frequency

Reconnection Time

Grid Vol High

Grid Vol Low

Grid HZ High

Grid HZ Low

Grid Setting

50HZ
60HZ

1.000

60S

265.0V

185.0V

62.0Hz

59.0Hz

Grid

Set2

Grid Setting

Q(V)

FW

Normal Ramp rate

Soft Start Ramp rate

VW

V1:0.0V Q1:0.00 Fstart:0.00Hz

Fstop:0.00Hz

Vstart:0.0V

Vstop:0.0V

0.0%/s

V2:0.0V Q2:0.00

V3:0.0V Q3:0.00

V4:0.0V Q4:0.00

0.0%/s

Grid

Set3

Grid Setting

L/HVRT

L/HFRT

HV2:0.0V

HV1:0.0V

LV1:0.0V

LV2:0.0V

LV3:0.0V

0.16S

0.16S

0.16S

0.16S

0.16S

HF2:0.00HZ

HF1:0.00HZ

LF1:0.00HZ

LF2:0.00HZ

0.16S

0.16S

0.16S

0.16S

Grid

Set4

Please select the correct Grid Mode in your local area. 

If you are not sure, please choose General Standard.

Please select the correct Grid Type in your local area,

otherwise the machine will not work or be damaged.

Please select the correct Grid Frequency in your local 

area.

You can hole this in default value.

UL1741&IEEE1547

CPUC RULE21

SRD-UL-1741

No need to set the func�on of this interface.

General Standard

For California only.

Summary of Contents for SUN 5K-SG01LP1-US

Page 1: ...Hybrid Inverter User Manual R ...

Page 2: ...ist 3 2 Mounting instructions 3 3 Battery connection 3 5 PV Connection 3 4 AC Input Output Connection 4 OPERATION 4 1 Power ON OFF 4 2 Operation and Display Panel 5 LCD Display Icons 5 1 Main Screen 5 2 Solar Power Curve 01 01 04 04 21 22 23 33 3 6 CT Connection 3 7 Earth Connection mandatory 3 8 WIFI Connection 3 9 Wiring System for Inverter Contents 5 4 System Setup Menu 5 5 Basic Setup Menu 5 3...

Page 3: ...ctly operate this inverter Be very cau ous when working with metal tools on or around ba eries Dropping a tool may cause a spark or short circuit in ba eries or other electrical parts even cause an explosion Please strictly follow installa on procedure when you want to disconnect AC or DC terminals Please refer to Installa on sec on of this manual for the details Grounding instruc ons this inverte...

Page 4: ...n Bu ons 4 DC Switch 5 Power on off bu on 6 RS 485 Port 7 CAN Port 8 Ba ery input connectors 9 Func on Port 10 Parallel Box master 11 Parallel port 12 PV input with two MPPT 13 Grid 14 Generator input 15 Load 16 WiFi Interface 1 02 2 3 4 5 8 9 10 11 12 13 14 15 16 7 6 ...

Page 5: ...or power Overload over temperature short circuit protec on Smart ba ery charger design for op mized ba ery performance With limit func on prevent excess power overflow to the grid Suppor ng WIFI monitoring and build in 2 strings of MPP trackers Smart se able three stages MPPT charging for op mized ba ery performance Time of use func on Smart Load Func on 2 3 Basic System Architecture The following ...

Page 6: ... on Please make sure nothing is damaged in the package You should have received the items in the following package Hybrid inverter x1 L type Hexagon wrench x1 Stainless steel an collision bolt M8 80 x4 Ba ery sensor x1 User manual User manual x1 Wi Fi Plug op onal x1 Sensor Clamp op onal US x2 EU x1 ...

Page 7: ... the television Antenna or antenna cable Not higher than al tude of about 2000 meters above sea level Not in environment of precipita on or humidity 95 Considering the following points before selec ng where to install Please select a ver cal wall with load bearing capacity for installa on suitable for installa on on concrete or other non flammable surfaces installa on is shown below Install this in...

Page 8: ...is inverter is heavy Please be careful when li ing out from the package Choose the recommend drill head as shown in below pic to drill 4 holes on the wall 52 60mm deep 1 Use a proper hammer to fit the expansion bolt into the holes 2 Carry the inverter and holding it make sure the hanger aim at the expansion bolt fix the inverter on the wall 3 Fasten the screw head of the expansion bolt to finish the ...

Page 9: ...nt protector or disconnect device is required between the ba ery and the inverter In some applica ons switching devices may not be required but over current protectors are s ll required Refer to the typical amperage in the table below for the required fuse or circuit breaker size Model 5 6 7 6 8Kw Wire Size 2AWG Cable mm 2 35 Torque value max 24 5Nm ...

Page 10: ... inverter is correctly connected Connec ng the ba ery with a suitable cable is important for safe and efficient opera on of the system To reduce the risk of injury refer to Chart 3 2 for recommended cables All wiring must be performed by a professional person 3 In case of children touch or insects go into the inverter Please make sure the inverter connector is fasten to waterproof posi on by twist i...

Page 11: ...ct GS will switch on no voltage output G valve 9 10 reserved RSD 11 12 provide 12Vdc output when inverter is on ATS 230V output port when inverter is on Note For EU model 7 6 8kW 230V 50Hz 1pcs CT is needed only and the secondary side of the CT should be connected to 5 6 port CT L2 CT L1 CT L2 Gen ATS N O Relay Neutral Earth Bond 240V Coil Inverter 11 12 ATS GS diesel generator startup signal rela...

Page 12: ...3 3 2 Ba ery temperature connec on 1 2 Temp CT 10 ...

Page 13: ...wer source please install a separate AC breaker between inverter and AC input power source This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current of AC input The recommended of AC breaker is 50A for 5kw and 80A for 8KW There are three terminal blocks with Grid Load and GEN markings Please do not misconnect input and output connectors All...

Page 14: ...to protect your appliance but some mes it s ll causes internal damage to the air condi oner Before connec ng to PV modules please install a separately DC circuit breaker between inverter and PV modules It is very important for system safety and efficient opera on to use appropriate cable for PV module connec on To reduce risk of injury please use the proper recommended cable size as below Chart 3 4 ...

Page 15: ...or posi ve and nega ve conductors 2 Suggest to put bootlace ferrules on the end of posi ve and nega ve wires with a proper crimping tool 3 Check correct polarity of wire connec on from PV modules and PV input connectors Then connect posi ve pole of connec on wire to posi ve pole of PV input connector Connect nega ve pole of connec on wire to nega ve pole of PV input connector Close the switch and ...

Page 16: ...3 6 CT Connec on Region EU Region US Inverter N L N L N L N L White wire 5 6 Black wire Grid L N CT 5 6 Grid Inverter N L2 L1 N L2 L1 White wire 3 4 5 6 3 4 5 6 Black wire L1 L2 N CT1 CT2 14 ...

Page 17: ...tra ons of the Wi Fi Plug 3 7 Earth Connec on mandatory Ground cable shall be connected to ground plate on grid side this prevents electric shock if the original protec ve conductor fails Note When the inverter is in the off grid state the N line needs to be connected to the earth ...

Page 18: ...tem for Inverter Region EU Battery Solar Breaker Breaker Breaker Earth BAR 5 6 CT CAN Generator Microinverter Smart Load L N PE Breaker or Load Inverter 16 Arrow pointing to grid Ground Ground N L2 L1 N L2 L1 N L2 L1 ...

Page 19: ...S 17 Battery Solar Breaker Breaker Breaker Breaker Earth BAR 3 6 4 5 CT CT CAN Generator Microinverter Smart Load L2 L1 N PE Breaker or Load Ground Ground Inverter N L2 L1 N L2 L1 N L2 L1 Arrow pointing to grid ...

Page 20: ...arallel Master Slave Modbus SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 Master inverter Slave Inverter Slave Inverter Load GEN Grid Parallel box Parallel A Parallel B Grid Load L N PE Inverter Inverter No 3 slave Ground Inverter No 2 slave Inverter No 1 master Battery pack ...

Page 21: ...wire CAN N wire PE wire 3 11 Split phase parallel connec on diagram Parallel Master Slave Modbus SN 01 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 Master inverter Slave Inverter Slave Inverter ...

Page 22: ...l box Parallel A Parallel B 3 12 Three phase Parallel Inverter Parallel Master Slave Modbus SN 01 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 A Phase Master inverter B Phase Master inverter C Phase Master inverter ...

Page 23: ...ee phase Parallel Master Slave Modbus SN 01 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 A Phase Master inverter B Phase Master inverter C Phase Master inverter L1 L1 L2 L2 L1 L2 L3 L1 L2 N PE L1 L1 L2 L2 L1 L2 L3 L1...

Page 24: ... on and Display Panel The opera on and display panel shown in below chart is on the front panel of the inverter It includes four indicators four func on keys and a LCD display indica ng the opera ng status and input output power informa on Chart 4 1 LED indicators LED Indicator DC AC Normal Alarm Green led solid light Green led solid light Green led solid light Red led solid light PV Connec on nor...

Page 25: ...et bu on you can enter into the system setup screen which including Basic Setup Ba ery Setup Grid Setup System Work Mode Generator port use Advanced func on and Li Ba info 4 The main screen showing the info including Solar Grid Load and Ba ery Its also displaying the energy flow direc on by arrow When the power is approximate to high level the color on the panels will changing from green to red so ...

Page 26: ...Main Screen Solar Page Solar Graph Grid Graph BMS Page Load Graph Battery Setting System Work Mode Grid Setting Gen Port Use Basic Setting Advanced Function Device info Grid Page Inverter Page Battery Page Load Page System Setup 24 ...

Page 27: ...will enter into the power curve page Status Power Frequency CT1 CT2 External Current Sensor Power BUY Energy from Grid to Inverter L1 L2 Voltage for each Phase LD1 LD2 Internal Current Sensor Power SELL Energy from Inverter to Load Power 44W DC T 52 6C AC T 41 0C L1 240V l1 0 6A Inverter This is Inverter detail page Inverter Genera on Voltage Current Power for each Phase DC T mean DC DC temperatur...

Page 28: ... 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 6 7 8 9 10 11 12 13 14 15 Curr Volt Curr Temp SOC Energy Charge Fault Sum Data Details Data Li BMS Solar power curve for daily monthly yearly and total can be roughly checked on the LCD for more accuracy power genera on pls check on the monitoring system Click the up and down arrow to check power...

Page 29: ...7 Factory Reset Reset all parameters of the inverter Lock out all changes Enable this menu for se ng parameters that require locking and cannot be set up Before performing a successful factory reset and locking the systems to keep all changes you need to type in a password to enable the se ng The password for factory se ngs is 9999 and for lock out is 7777 This is System Setup page Factory Reset P...

Page 30: ...attery Setting Start A 30 30 40A 40A Batt Set2 This is Ba ery Setup page Start 30 Percent S O C at 30 system will AutoStart a connected generator to charge the ba ery bank A 40A Charge rate of 40A from the a ached generator in Amps Gen Charge uses the gen input of the system to charge ba ery bank from an a ached generator Gen Signal Normally open relay that closes when the Gen Start signal state i...

Page 31: ...ut will resume Float V 53 6V 20 35 50 5 Absorption V 57 6V Equalization V 57 6V Equalization Days Shutdown Low Batt Restart TEMPCO mV C Cell Batt Resistance 30 days Equalization Hours 3 0 hours 25mOhms Battery Setting Set3 Batt Recommended ba ery se ngs Battery Type AGM or PCC Absorption Stage 14 2v 57 6v 13 4v 53 6v Float Stage Torque value every 30 days 3hr 14 2v 57 6v Gel 14 1v 56 4v 13 5v 54 0...

Page 32: ...r will only provide power to the backup load connected The hybrid inverter will neither provide power to the home load nor sell power to grid The built in CT will detect power flowing back to the grid and will reduce the power of the inverter only to supply the local load and charge the ba ery Zero Export To CT Hybrid inverter will not only provide power to the backup load connected but also give p...

Page 33: ...18 00 01 00 when ba ery SOC is higher than 35 hybrid inverter will discharge the ba ery un l the SOC reaches 35 Time Of Use Time System Work Mode Batt Grid Charge Gen 01 00 05 00 08 00 10 00 15 00 18 00 5 00 8 00 10 00 15 00 18 00 01 00 Power 8000 8000 8000 8000 8000 8000 80 40 40 80 40 35 Work Mode2 For example Solar Sell Solar sell is for Zero export to load or Zero export to CT when this item i...

Page 34: ...0V Vstop 0 0V 0 0 s V2 0 0V Q2 0 00 V3 0 0V Q3 0 00 V4 0 0V Q4 0 00 0 0 s Grid Set3 Grid Setting L HVRT L HFRT HV2 0 0V HV1 0 0V LV1 0 0V LV2 0 0V LV3 0 0V 0 16S 0 16S 0 16S 0 16S 0 16S HF2 0 00HZ HF1 0 00HZ LF1 0 00HZ LF2 0 00HZ 0 16S 0 16S 0 16S 0 16S Grid Set4 Please select the correct Grid Mode in your local area If you are not sure please choose General Standard Please select the correct Grid...

Page 35: ... at which the Smart load will switch on And at the same me the PV input power should exceed the se ng value Power simultaneously and then the Smart load will switch on On Grid always on When click on Grid always on the smart load will switch on when the grid is present Micro Inv Input To use the Generator input port as a micro inverter on grid inverter input AC coupled this feature will also work ...

Page 36: ...o cuts off Earth Neutral load port N line bond via connect external relay When the inverter disconnects from the grid ATS port voltage will be 0 and the Earth Neutral bond keeps on More details please refer to le picture coil external relay closed contact L N ATS load port Inverter shell Ground cable 230V Ex_Meter For CT when in Three phase system with CHNT Three phase energy meter DTSU666 click co...

Page 37: ... 70A 30 6C 52 0 26 0Ah 0 0V 0 0A 0 0 0 50 33V 19 10A 31 0C 51 0 25 5Ah 53 2V 25 0A 0 0 0 50 30V 16 90A 30 2C 12 0 6 0Ah 53 2V 25 0A 0 0 0 4 5 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 ...

Page 38: ...DC cable Generator Grid Backup Load On Grid Home Load Battery Solar CT AC cable DC cable Smart Load Mode III With Generator Mode IV With Smart Load Grid Backup Load On Grid Home Load Battery Solar On Grid AC couple AC cable DC cable On Grid Inverter Mode V AC Couple ...

Page 39: ...r status displayed on the LCD is as detailed as possible 5 Your contact informa on In order to give you a clearer understanding of the inverter s fault informa on we will list all possible fault codes and their descrip ons when the inverter is not working properly The 1st priority power of the system is always the PV power then 2nd and 3rd priority power will be the ba ery bank or grid according t...

Page 40: ...oad power connected 3 Turn off the DC switch and AC switch and then wait one minute then turn on the DC AC switch again 4 Seek help from us if can not go back to normal state Leakage current fault 1 Check PV side cable ground connection 2 Restart the system 2 3 times 3 If the fault still exists please contact us for help Remotely shutdown 1 it tells the inverter is remotely controlled and is in of...

Page 41: ... is in the range of specification or not 2 Check whether AC cables are firmly and correctly connected 3 Seek help from us if can not go back to normal state F56 DC busbar voltage is too low Battery voltage low 1 Check whether battery voltage is too low 2 If the battery voltage is too low using PV or grid to charge the battery 3 Seek help from us if can not go back to normal state F58 BMS communica...

Page 42: ...ct is replaced by the company itself during the warranty period all rights and interests of the replacement product or component belong to the company Factory warranty does not include damage due to the following reasons Damage during transporta on of equipment Damage caused by incorrect installa on or commissioning Damage caused by failure to comply with opera on instruc ons installa on instruc o...

Page 43: ...ker AC Output Data 22 9A 2 mes of rated power 10 S 35A 40A 50A 50A 36 7A 38 5A 20 8A 27 5A 25A 34 9A 36 3A 31 7A 33A 33 4A 35A 1 1 5000 5500 2 1 6000 6600 2 2 7600 8360 2 2 8000 8800 Rated AC Output and UPS Power W 50 60Hz 120 240Vac split phase 208Vac 2 3 phase 230Vac single phase Split phase 2 3 phase Single Phase Output Frequency and Voltage Grid Type THD 3 Linear load 1 5 97 60 Current Harmoni...

Page 44: ...ions and Standards Grid Regula on IEC62109 1 IEC62109 2 Safety Regula on EN61000 6 1 EN61000 6 3 FCC 15 class B EMC General Data Protec on Degree Opera ng Temperature Rande Cooling Noise dB Communica on with BMS Weight kg Size mm Installa on Style Warranty 25 60 45 Dera ng 30 dB Smart cooling RS485 CAN 32 420W 670H 233D IP65 5 years Wall mounted ...

Page 45: ...8 Need confirm CAN_H CAN_L note 48V Storage inverter RS485orCAN 12 3 11 0 0 0 13 CAN CAN CAN CAN RS485 RS485 RS485 Model US2000 US2000 PLUS B4850 POWERBOXF 48Vxxxx 48Vxxxx 48Vxxxx 48Vxxxx HY48050 48Vxxxx BMS48150 H4850M UZ EB51 2 100 A11 Brand CCGX SOLAX UZ ENERGY SACRED SUN Topakpower GSL GenixGreen PYLON DYNESS Herewin techlogy Sunwoda X ratong Enershare Technology PYLON 3 0 GS10000 BPE AOBOET A...

Page 46: ...Add No 26 30 South Yongjiang Road Beilun 315806 Ningbo China Fax 86 0 574 8622 8852 Tel 86 0 574 8622 8957 E mail service deye com cn Web www deyeinverter com 502012022 Ver 2 0 2020 12 ...

Reviews: