- 33 -
Time of use:
it is used to program when to use grid or
generator to charge the battery, and when to discharge
the battery to power the load. Only tick "Time Of Use"
then the follow items (Grid, charge, time, power etc.)
will take effect.
Note:
when in selling first mode and click time of use,
the battery power can be sold into grid.
Grid charge:
utilize grid to charge the battery in a time
period.
Gen charge:
utilize diesel generator to charge the battery
in a time period.
Time:
real time, range of 01:00-24:00.
Power:
Max. discharge power of battery allowed.
Batt(V or SOC %):
battery SOC % or voltage at when the
action is to happen.
Time Of Use
Time
System Work Mode
Batt
Grid
Charge Gen
01:00
05:00
09:00
13:00
17:00
21:00
5:00
9:00
13:00
17:00
21:00
01:00
Power
12000
12000
12000
12000
12000
12000
49.0V
50.2V
50.9V
51.4V
47.1V
49.0V
Work
Mode2
During 01:00-05:00, when battery SOC is lower than 80%, it will
use grid to charge the battery until battery SOC reaches 80%.
During 05:00-08:00 and 08:00-10:00, when battery SOC is higher
than 40%, hybrid inverter will discharge the battery until the SOC
reaches 40%.
During 10:00-15:00, when battery SOC is higher than 80%, hybrid
inverter will discharge the battery until the SOC reaches 80%.
During 15:00-18:00, when battery SOC is higher than 40%, hybrid
inverter will discharge the battery until the SOC reaches 40%.
During 18:00-01:00, when battery SOC is higher than 35%, hybrid
inverter will discharge the battery until the SOC reaches 35%.
Time Of Use
Time
System Work Mode
Batt
Grid
Charge Gen
01:00
05:00
08:00
10:00
15:00
18:00
5:00
8:00
10:00
15:00
18:00
01:00
Power
80%
40%
40%
80%
40%
35%
Work
Mode2
For example:
Solar Sell:
“Solar sell” is for Zero export to load or Zero export to CT: when this item is active, the surplus
energy can be sold back to grid. When it is active, PV Power source priority usage is as follows: load
consumption and charge battery and feed into grid.
Max. sell power:
Allowed the maximum output power to flow to grid
.
Zero-export Power:
for zero-export mode, it tells the grid output power. Recommend to set it as 20-100W
to ensure the hybrid inverter won' t feed power to grid.
Energy Pattern:
PV Power source priority.
Batt First:
PV power is firstly used to charge the battery and then used to power the load. If PV power is
insufficient, grid will make supplement for battery and load simultaneously.
Load First:
PV power is firstly used to power the load and then used to charge the battery. If PV power is
insufficient, Grid will provide power to load.
Max Solar Power:
allowed the maximum DC input power
.
Grid Peak-shaving:
when it is active, grid output power will be limited within the set value. If the load
power exceeds the allowed value, it will take PV energy and battery as supplement. If still can’t meet the
load requirement, grid power will increase to meet the load needs.
12000
12000
12000
12000
12000
12000