4. OPERATION

4.1 Power ON/OFF

Once the unit has been properly installed and the batteries are connected well,simply 
press On/Off button(located on the left side of the case) to turn on the unit.When system 
without battery connected,but connect with either PV or grid,and ON/OFF button is 
switched off,LCD will still light up(Display will show OFF),In this condition,when switch 
on ON/OFF button and select NO battery,system can still working.

4.2 Operation and Display Panel

The operation and display panel,shown in below chart,is on the front panel of the inverter.It 
includes four indicators,four function keys and a LCD display,indicating the operating status 
and input/output power information.

Chart 4-1 LED indicators

LED Indicator

DC

AC

Normal

Alarm

Green led solid light

Green led solid light

Green led solid light

Red led solid light

PV Connection normal

Grid Connection normal

Inverter operating normal

Malfunction or warning

Messages

Chart 4-2 Function Buttons

Function Key

Esc

Up

Down

Enter

Description

To exit setting mode

To go to previous selection

To go to next selection

To confirm the selection

- 19 -

- 20 -

L wire

CAN

N wire

PE wire

Battery pack

Grid

CAN

L1 L2 L3

N PE

Load

GEN

Grid

Load

GEN

Grid

Load

GEN

Grid

Inverter No.1(master)

Inverter No.2(slave)

Inverter No.3(slave)

Load

L3 L2 L1

N PE

Parallel  box 

Parallel A

Parallel B

Pa

+-

3.12 Three phase Parallel Inverter

Parallel

Master

Slave

Modbus SN

01

A Phase

B Phase

C Phase

Advanced Function

Paral.

Set3

Parallel

Master

Slave

Modbus SN

02

A Phase

B Phase

C Phase

Advanced Function

Paral.

Set3

Parallel

Master

Slave

Modbus SN

03

A Phase

B Phase

C Phase

Advanced Function

Paral.

Set3

A Phase Master inverter

B Phase Master inverter

C Phase Master in

verter

Summary of Contents for INGE

Page 1: ...US EU SUN 8K SG01LP1 US EU SUN 6K SG01LP1 US SUN 5K SG01LP1 US User Manual R Add No 26 30 South Yongjiang Road Beilun 315806 Ningbo China Fax 86 0 574 8622 8852 Tel 86 0 574 8622 8957 E mail wutz deye com cn Web www deyeinverter com KX ...

Page 2: ...er Curve 3UJK G RZ OTLUXSGZOUT GTJ VXUIKYYOTM 2OSOZGZOUT UL 2OGHOROZ_ GZGYNKKZ 3 6 CT Connection 3 7 Earth Connection mandatory 3 8 WIFI Connection 3 9 Wiring System for Inverter Contents 5 6 Battery Setup Menu 5 4 System Setup Menu 5 5 Basic Setup Menu 5 3 Curve Page Solar Load Grid 5 7 System Work Mode Setup Menu 5 8 Grid Setup Menu 5 9 Generator Port Use Setup Menu 5 10 Advanced Function Setup ...

Page 3: ...l may cause a spark or short circuit in batteries or other electrical parts even cause an explosion Please strictly follow installation procedure when you want to disconnect AC or DC terminals Please refer to Installation section of this manual for the details Grounding instructions this inverter should be connected to a permanent grounded wiring system Be sure to comply with local requirements an...

Page 4: ...optimized battery performance Time of use function Smart Load Function The following illustration shows basic application of this inverter It also includes following devices to have a Complete running system Generator or Utility PV modules Consult with your system integrator for other possible system architectures depending on your requirements This inverter can power all kinds of appliances in ho...

Page 5: ...wn in the diagram to guarantee sufficient heat dissipation and have enough space for removing wires Please select a vertical wall with load bearing capacity for installation suitable for installation on concrete or other non flammable surfaces installation is shown below Install this inverter at eye level in order to allow the LCD display to be read at all times For proper air circulation to dissi...

Page 6: ...attery cable with correct connector which can well fit into the battery terminals 2 Use a suitable screwdriver to unscrew the bolts and fit the battery connectors in then fasten the bolt by the screwdriver make sure the bolts are tightened with torque of 24 5 N M 2 Nm in clockwise direction make sure polarity at both the battery and inverter is correctly connected 3 In case of children touch or in...

Page 7: ...sure to open DC protector or disconnector first 2 Remove insulation sleeve 10mm length unscrew the bolts insert the AC input wires according to polarities indicated on the terminal block and tighten the terminal screws Make sure the connection is complete All wiring must be performed by a qualified personnel It is very important for system safety and efficient operation to use appropriate cable fo...

Page 8: ...ative conductors 2 Suggest to put bootlace ferrules on the end of positive and negative wires with a proper crimping tool 3 Check correct polarity of wire connection from PV modules and PV input connectors Then connect positive pole of connection wire to positive pole of PV input connector Connect negative pole of connection wire to negative pole of PV input connector Close the switch and make sur...

Page 9: ...eeds to be connected to the earth 3 7 Earth Connection mandatory Ground cable shall be connected to ground plate on grid side this prevents electric shock if the original protective conductor fails Region EU Region US Inverter N L N L N L N L White wire 5 6 Black wire Grid L N CT 5 6 Note Grid Inverter N L2 L1 N L2 L1 White wire 3 4 5 6 3 4 5 6 Black wire L1 L2 N CT1 CT2 13 14 ...

Page 10: ...ator Microinverter Smart Load L1 N PE Breaker or Load Ground Inverter N L N L N L Battery Solar Breaker Breaker Breaker Breaker Earth BAR 3 6 4 5 CT CT CAN Generator Microinverter Smart Load L2 L1 N PE Breaker or Load Generat Ground Inverter N L2 L1 N L2 L1 N L2 L1 15 16 Arrow pointing to grid Arrow pointing to grid ...

Page 11: ...02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 Master inverter Slave Inverter Slave Inverter Parallel Master Slave Modbus SN 01 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03...

Page 12: ...Green led solid light Green led solid light Green led solid light Red led solid light PV Connection normal Grid Connection normal Inverter operating normal Malfunction or warning Messages Chart 4 2 Function Buttons Function Key Esc Up Down Enter Description To exit setting mode To go to previous selection To go to next selection To confirm the selection 19 20 L wire CAN N wire PE wire Battery pack...

Page 13: ...use Advanced function and Li Batt info 4 The main screen showing the info including Solar Grid Load and Battery Its also displaying the energy flow direction by arrow When the power is approximate to high level the color on the panels will changing from green to red so system info showing vividly on the main screen PV power and Load power always keep positive Grid power negative means sell to grid...

Page 14: ... 200 KWh System Solar Power Year CANCEL Day Month Year Total Total 400 0 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 800 1200 1600 2000 2000KWh CANCEL Day Month Year Total System Grid Power Total 5 3 Curve Page Solar Load Grid This is Battery detail page if you use Lithium Battery you can enter BMS page Power 42W Today 0 0 KWH Total 0 80 KW...

Page 15: ...0 40A 40A Batt Set2 ʑ This is Battery Setup page Start 30 It indicates that the Generator will start when the Battery capacity is less than 30 in the condition of Off grid mode A 40A It indicates the Current that the Generator charges the Battery after started Gen Charge The Switch that the Generator charges the Battery Gen Signal It indicates whether the Generator s ATS signal is on Max RunTime x...

Page 16: ...o the public grid Time Of Use Time System Work Mode Batt Grid Charge Gen 01 00 5 00 05 00 9 00 09 00 13 00 13 00 17 00 17 00 21 00 21 00 01 00 80 80 80 80 80 80 Work Mode2 ʏ ʐ ʑ Time of use ʏ ʐ ʑ Switch for Grid charging the battery Switch for Gen charging the battery There are six time period can be set each period must from small to large 5 8 Grid Setup Menu For California only Grid Setting Grid...

Page 17: ...2C 12 0 6 0Ah 53 2V 25 0A 0 0 0 4 5 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0...

Page 18: ...r On Grid AC couple AC cable DC cable Single Phase Inverter 3UJK OZN 5T XOJ T KXZKX 31 32 Grid Backup Load On Grid Home Load Battery Solar CT AC cable DC cable Generator Grid Backup Load On Grid Home Load Battery Solar CT AC cable DC cable Smart Load Grid Backup Load On Grid Home Load Battery Wind CT AC cable DC cable UTZXURRKX OTJ XHOTK 3UJK OZN OTJ XHOTK 3UJK OZN KTKXGZUX 3UJK OZN 9SGXZ 2UGJ 1 I...

Page 19: ...er are within the range 2 Restart and check whether it is in normal 3 Seek help from us if can not go back to normal state DC side over current fault 1 Check PV module connect and battery connect 2 Turn off the DC switch and AC switch and then wait one minute then turn on the DC AC switch again 3 Seek help from us if can not go back to normal state Leakage current fault 1 Check the cable of PV mod...

Page 20: ...US SUN 6K SG01LP1 US SUN 8K SG01LP1 US EU SUN 7 6K SG01LP1 US EU GZZKX_ TV Z GZG Battery Type Lead acid or lithium ion Battery Voltage Range V 40V 60V Max Charging Current A Max Discharging Current A 120A 120A 135A 135A 190A 190A 190A 190A Charging Curve External Temperature Sensor Charging Strategy for Li Ion Battery 6 9ZXOTM TV Z GZG Max DC Input Power W PV Input Voltage V MPPT Range V Start up ...

Reviews: