![Desmi NSL 100-215 Operation And Maintenance Instruction Download Page 97](http://html1.mh-extra.com/html/desmi/nsl-100-215/nsl-100-215_operation-and-maintenance-instruction_2487038097.webp)
ASSEMBLING PUMP SET
DESMI Pumping Technology A/S
Tagholm 1
9400 Nørresundby
– Denmark
Tlf. nr.: +45 96 32 81 11
Fax +45 98 17 54 99
95
E-mail: [email protected] www.desmi.com
10.
ASSEMBLING THE PUMP SET
CAUTION
RISK OF PROPERTY DAMAGE!
The type of accessories used during assembling work including oil and grease shall
meet the the requirement from application, food-approved if required.
10.1. 12 combination
10.1.1. Fitting sealing rings
1. When fitted, the sealing ring (4) is to bear
against the shoulder of the pump casing.
For Ø330/415/418/525, when fitted the sealing ring
(27) is to bear against the shoulder of the rear cover
(18).
For ø418, secure the sealing ring (27) with counter
sunk screws (105).
Summary of Contents for NSL 100-215
Page 2: ......