DESIGN HOUSE 594812 Quick Manual Download Page 1

SINGLE HANDLE

SHOWER TRIM WITH VALVE

 Models  

Your new Design House trim will give you years of trouble free performance. Thank you for

choosing our product for your home. 

Please read all of these instructions carefully before

installing your new trim.

When installing your new trim, hand tighten the connector nuts, then use one wrench to

anchor the fitting and a second wrench to tighten the nut one additional turn. Connections that

are too tight will reduce the integrity of the system.

Wrap threaded connections (except aerator thread in spout or where o-ring or rubber sealant

are present) with Teflon tape available from your local hardware or plumbing supply store.

Always wrap in a clockwise direction.

IMPORTANT POINTS

SAFETY TIPS

ALWAYS

 protect your eyes with safety glasses.

Helpful tools to install this valve:

Teflon Tape

(2) Crescent Wrenches

Basin Wrench

Flashlight

Faucet Supply Tubes

Silicon Sealer

INSTALLATION PROCEDURE

5.  Flushing the water outlets and checking for

leaks

Place the handle (1) on the valve body (2)

inverter and turn the handle (1) to the full on

mixed position. Turn on the hot and cold water

 

supply lines and allow the water to flow from

the outlets for one minute, or until all foreign

 

matter has been flushed out. Check for leaks.

Shut off the water at the faucet and supply

lines. Remove the handle (1).

4.  Back to back installation

If the hot and cold inlets are reversed (hot on right

and cold on left), remove the screw (1), inverter

(2), sleeve (3), and bonnet (4) from the valve body

(5) with reversed supply connections. Rotate the

cartridge (6) 180°, so H appears on the right.

Install the cartridge making sure that the key is

fully engaged with the slot in the valve body (5).

Slide the bonnet (4) over the cartridge (6) and

thread them onto the valve body (5). Hand tighten

securely. Reassemble the sleeve (3), inverter (2)

and screw (1). If you are not making a reverse or

back to back installation, skip this step and

continue with the step 5.

NOTE: Never install the valve body (5) upside

down!

2

3

1. 

Preparing for installation

A. Shut off the water supply to the tub and shower.

B. Verify that the hole sizes and positions of the

holes in the wall are correct:

 i. The shower and tub spout outlet holes should be

1-1/4 in. diameter.

 ii. The valve access hole dimensions should be 6

in. diameter.

 iii. The recommended valve depth to the finished

wall is 2-1/8 in. min. to 3 in. max.

C. Ensure that the valve body (1) cover is flush with

the finished exterior surface of the wall. Position the

valve body (1) correctly in the wall with the side

marked "UP" pointing up. The 8 in. minimum from

the valve body (1) to the tub spout is required for

proper operation.

2.  Removing the plaster guard

Unscrew the screws (1), and remove the

plaster guard (2).

3.  Shower only outlet connections

Wrap thread sealant tape (not included) around the

pipe threads in a clockwise direction.Connect the hot

and cold water supply lines (1, not included), the

shower outlet pipe (2, not included) into the valve

body (3) in a clockwise direction. Tighten the pipes to

the valve body (3) with a pipe wrench (not included).

Wrap thread sealant tape around the threads of the

plug (4), and insert it into the bottom outlet (5).

Connect the pipe elbows (6, not included) to the end

of the shower outlet pipe.

NOTE: a. Be sure to position the body (3) correctly in

the wall, with the markings "UP" facing upward.

    b. The hot water supply lines go into the H inlet,

and the cold water supply lines go into the C inlet.

1-800-558-8700

Mequon, WI 53092

Design House is a registered

     brand of DHI Corp.

1

5

6

6.  Installing the plaster guard

Place the plaster guard (1) onto the valve body

(2) and secure with the screws (3).

NOTE: Be sure to position the plaster guard (1)

correctly onto the valve body (2), with the side

marked "SHOWER" facing upward.

       30 in.

Tub & Shower

8 in. Min.

      48 in.

Shower Only

1 1/4 in.

Diameter

1 1/4 in. Diameter

       48 in.

Tub & Shower

6in. Dia

       30 in.

Shower Only

1

2

1

   Reverse

Installation

HOT

HOT

COLD

Normal

Installation

(changes not

required)

COLD

H

Normal Installation

H

Reverse Installation

1

2

3

4

5

6

1

2

1

2

3

1

1

2

3

6

4

5

4

o    594812 - Polished Chrome

o    594820 -  Satin Nickel

o    594838 - Oil Rubbed Bronze

o    594846 - Matte Black

Grove Joint Pliers

Reviews: