background image

DRAWING FOR STEP 1

                

                

                 

 

STEP 8 

INSTALL AND ADJUST UPPER

                CONNECTING TUBE

           1.Keep the end of the tube with the threaded

              insert upward to connect it with the threaded

              bolt in the top latch  assembly

           2.Connect the other end of the tube to the

              internal mechanism of the head assembly

              by inserting the connecting pin into the 

              holes.

           3.Turn and adjust upper connecting tube

              until top latch assembly retracts properly 

              and then fix the connecting pin by bending 

              2 ends.

STEP 7 

INSTALL BOTTOM LATCH 

                ASSEMBLY

           1.Align vertical center line of bottom

              latch assembly and lower connecting tube

              as shown on template. Mark door as

              indicated on template (B-2).

             

 CAUTTON : BE SURE THE DISTANCE

              FROM BOTTOM SIDE OF DOOR EDGE 

              TO BOTTOM OF BOTTOM LATCH 

              ASSEMBLY IS 13/32".

           2.Tighten screws to install bottom latch 

              assembly.

STEP 12 

INSTALL TWO ROD GUIDES

            1.Take the approximately middle of upper and

                lower connecting tube.

            2.Tighten screws to install rod guides.

STEP 11 

TEST ACTUATING BAR AND 

                   DOGGING OPERATION

            1.The top latch assembly should engage the top

               strike and the bottom latch assembly should

               engage the floor strike when the door is closed.

               If the door can be pushed open without 

               depressing the actuating bar, the upper 

               connecting tube has been over adjusted. 

               Readjust it as needed.

            2.The top and bottom latch assembly should

               disengage from the strikes freely when

               the actuating bar is depressed or dogged

               down. If they do not disengage, adjust the

               bolt in the bottom latch assembly as needed and 

               retest for proper operation.

STEP 9 

INSTALL AND ADJUST LOWER

                 CONNECTING TUBE

           1.Keep the end of the tube with the threaded

              insert downward to connect it with the 

              threaded bolt in the bottom latch assembly

           2.Connect the other end of the tube to the 

              internal mechanism of the head assembly 

              by inserting the connecting pin into the holes.

           3.Connect bolt in bottom latch assembly with 

              lower connecting tube.

              Then, depress actuating bar and adjust lower 

              connecting tube until bottom latch assembly

              retracts properly.

              Then, fix the connecting pin by bending 2 

              ends. Do not let bolt in bottom latch assembly 

              touch floor while depressing actuating bar.

STEP 10

INSTALL FLOOR STRIKE

            1.Let the bolt in the lower bottom latch assembly

               touch the floor and mark on floor.

            2.Drill a 5/8” dia, 1” deep hole.

            3.Let the bolt in the lower bottom latch assembly

               insert into the center hole of floor strike and 

               mark 3 anchor / screw holes on floor.

            4.Drill 3 anchor / screw holes, 1/4" dia , 1 1/8" deep.

            5.Hammer 3 anchors into 3 anchor / screw holes.

               Tighten up 3 screws.

           

STEP 13 : INSTALL 4 COVERS

                Install head cover, end cover, top latch

                cover,bottom latch cover and tighten screws.

STEP 6 

INSTALL TOP LATCH ASSEMBLY

           1.Align vertical center line of top latch 

              assembly and upper connecting tube as 

              shown on template (B-1). Mark door as 

              indicated on template (B-1).

              CAUTION: BE SURE THE  DISTANCE

              FROM DOOR FRAME TO LINE

              W MUST BE 2"

           2.Tighten screws to install top latch assembly.

Summary of Contents for F1000V Series

Page 1: ...F1000V Series FIRE RATED EXIT DEVICE INSTALLATION INSTRUCTIONS 2012 03 ...

Page 2: ... Align vertical center line of top strike and upper connecting tube as shown on template B 1 Mark door as indicated on template B 1 2 Tighten screws to install top strike with proper adjustment STEP 2 MARK CENTER LINE ON DOOR Mark center line on inside of door Establish the horizontal center line of the device by drawing a line across the door 40 above floor line STEP 3 MARK DOOR AND DRILL HOLES 1...

Page 3: ...ing bar is depressed or dogged down If they do not disengage adjust the bolt in the bottom latch assembly as needed and retest for proper operation STEP 9 INSTALL AND ADJUST LOWER CONNECTING TUBE 1 Keep the end of the tube with the threaded insert downward to connect it with the threaded bolt in the bottom latch assembly 2 Connect the other end of the tube to the internal mechanism of the head ass...

Page 4: ... 1 4 20P x 3 4 5 PCS 14 x1 1 2 13 PCS Rod Connector 2 PCS Bottom Rod Self Tapping Flat Head HEAD COVER BODY ACTUATING BAR END COVER PARTS IDENTIFICATION Thru Bolts 10 PCS 1 4 x 1 1 4 8PCS Round Head Rod Guide Insert 2 PCS 1 4 x 1 4 PCS Round Head 8 x 5 8 4 PCS Round Head Round Head 1 4 20P x 3 4 4PCS Rod Guide 2PCS Self Tapping 5 32 x3 4 3 PCS 1 4 x 1 3 PCS Anchor 1 Top Rod ...

Page 5: ...bolts 4 13 32 A A A A A A A A A A A A B 40 above floor line Fold on dotted line and Round Head Screws Round Head Screws fit on door edge 1 3 16 4 13 32 2 3 4 2 3 4 1 3 16 40 above floor line Fold on dotted line and fit on door edge B CENTER LINE CENTER LINE 2012 03 1 19 32 1 19 32 1 19 32 1 19 32 When installing 1000R x 1000V on a pair of doors a Double Door Strike DDS is required For complete tem...

Page 6: ... Listed drill tap for 2 1 4 20Px3 4 machine screws C D for bottom latch assembly Or drill 2 3 16 pilot holes C D for self tapping machine screws or wood screws for bottom latch assembly B For F1000V Fire Rated drill 9 32 holes C D inside and 3 8 holes C D outside for the 2 thru bolts Note When installing bottom latch assembly 1 Drill 1 C hole and install screw but do not tighten all the way 2 Dril...

Page 7: ...N DOOR FRAME FLAT HEAD MACHINE SCREW CAUTION Drill F hole after top latch assembly properly works FL TOP STRIKE TOP LATCH BOLT AT HEAD SCREW Adjust the location of the top latch assembly and top latch base so there is 3 32 space between top strike and inside of top latch bolt ROUND HEAD SCREW CAUTION FLAT HEAD MACHINE SCREWS 1 4 20P x 3 4 x 2 1 4 20P x 3 4 1 4 20P x 3 4 1 4 20P x 3 4 2012 03 1 G N...

Reviews: