45
Chapter 5 : Initial Start-up
5.1
Inspection Prior to Activation
WARNING:
Only qualified service staff may perform the installation steps hereunder.
WARNING:
This equipment contains high voltage that can be fatal! Make sure that the power
is disconnected before you perform the following.
WARNING:
Arbitrary startup without correctly finishing the inspection prior to startup as
indicated in 4.1 can lead to serious personal injuries or damage to the equipment.
Please finish all of the inspections prior to the initial activation of the program.
Inspection Checklist
General
There is no damage to the surroundings of the device.
Device positioning is finished.
The installation has been completed in compliance with
Section 3: Installation
Instructions
.
Piping inside and outside the cabinet has been correctly connected. The insulation
layer of the pipeline is free of signs of impairment or leakage.
The access door is in place and the console cable is re-connected.
Environmental Protection
The indoor environment is a closed space isolated from interference of external
temperature and humidity.
The clearance in the surroundings of the cabinet meets requirements (See
3.2
Clearance
).
Correct environmental humidity (See
5.2 Operating Temperature & Humidity
).
Electronic Connection
The rated value of input power is identical to that marked on the nameplate.
The equipment has been properly earthed.
All electronic connections are tightly secure.