Installation
Unpacking
Check for any damage that may have occurred to the consignment in
transit. Check that the contents of the consignment agree with the
Packing List.
If any damage or shortage is apparent, notify the agents and the carriers
immediately.
Make a note of the sensor(s) serial number(s), and check that the cable
supplied is the length that was ordered. The serial numbers will be
needed in any subsequent warranty claims, repairs or recalibration.
The parts supplied may include:
•
UV3pA, B or AB sensor with cable fitted
•
Levelling mount or other mounting bracket
Cable lengths, other than the standard 5m, that are pre-ordered will
normally be fitted in unbroken lengths.
Description of Equipment
Outline Diagrams:
6
z
Installation
UV3 User Manual 1.1