Dell PowerEdge R320 Planning, Installation And Service Manual Download Page 1

R320 Honeywell Server Planning, Installation and Service

Guide

HWDOC-X238-en-A

     August

20

20

Summary of Contents for PowerEdge R320

Page 1: ...R320 Honeywell Server Planning Installation and Service Guide HWDOC X238 en A August 2020 ...

Page 2: ...al Sàrl While this information is presented in good faith and believed to be accurate Honeywell disclaims the implied warranties of merchantability and fitness for a purpose and makes no express warranties except as may be stated in its written agreement with and for its customer In no event is Honeywell liable to anyone for any direct special or consequential damages The information and specifica...

Page 3: ...2 3 2 Dell documentation 15 2 4 LCN node slot requirements 16 2 5 Experion nodes slot requirement 16 2 5 1 Default configurations for FTE 16 2 5 2 FTE supervisory Default 16 2 5 3 Cnet configuration using PCIC interface 16 2 6 Memory configuration for Dell R320 16 2 6 1 4GB consisting of two 2GB RDIMM for Pre MLK servers 17 2 6 2 8GB consisting of four 2GB RDIMM or two 4GB RIDMM for Pre MLK server...

Page 4: ...y compliance 27 2 9 Light industrial regulatory compliance 27 2 9 1 Electromagnetic Compatibility 27 2 9 2 Safety compliance 28 Chapter 3 Installation 29 3 1 Tasks for installing the server 29 3 1 1 Before you begin 29 3 2 Power and grounding requirements 29 3 2 1 Grounding consoles and cabinets 29 3 3 Cabinet spacing requirements 30 3 3 1 Unused cabinet spaces 30 3 4 Installing the server and con...

Page 5: ... LCNP4e LCNP4e2 43 5 1 1 Adding or replacing the LCNP4E LCNP4e2 board 43 5 1 2 Modifying VGA port saver 46 5 2 Servicing the hard disk drives and power supply 48 5 2 1 References 48 5 3 Adding additional memory in Dell R320 49 5 3 1 Prerequisites 49 5 3 2 To add additional memory 50 5 4 Installing hot spare hard drive 51 5 4 1 To insert the hot spare hard drive 52 5 5 Servicing Honeywell options 5...

Page 6: ...5 8 1 Integrated Dell Remote Access Controller 6 iDRAC6 issue 65 6 ...

Page 7: ...face to LCN is not used The LCN MAU is disconnected and or the LCNP board is removed Redundant ELCN Bridges are required if the ELCN node is communicating with any other existing coaxial based LCN node Some LCN nodes may have been replaced by their ELCN equivalent nodes and overall system features architecture will differ from that of a non ELCN integrated system classic LCN TPN system In this cas...

Page 8: ...cribes configuration tasks needed for TPS Nodes Virtualization Planning and Implementation Guide EPDOC X147 en A Implementing networks Preparing ESXi host Administering virtualization Server and Client Planning Guide EPDOC X128 en 511A High level planning design for Experion servers clients controllers Process Operations Manual SW11 601 Process operations alarm message handling reporting history f...

Page 9: ...ssues special considerations Customer Release Guide R687 CRG 687 TPN TPS Migration information ELCN migration Information included TPN R687 Software Change Notice TNDOC X166 en 6871A Document changes compatibility and migration installation processes for the TPS Process Network Release of R687 software Experion Control Building User s Guide EPDOC XX19 en 511A Procedures for basic tasks in the Cont...

Page 10: ...ied its use for specific configuration items as identified in the Software Change Notice SCN The server is not a standard Dell model and cannot be ordered independently from Dell The Technical Assistance Center TAC is well trained and supports Honeywell platforms Use of any other server including a similar Dell model is considered a project special and its TAC support is limited according to the s...

Page 11: ... APP nodes and ACE T nodes 2 1 2 BIOS configuration The BIOS version for the server depends on the Tab numbers The Tab number for Dell R320 is as follows l Tab 51155519 100 with BIOS version 1 3 5 Honeywell 1 0 0 l Tab 51155519 200 with BIOS version 2 0 22 or higher 2 2 Description l Honeywell server model number l Electronics configuration l Electronics module l Standard features of Dell R320 l S...

Page 12: ... bit COA EP COAR28 Microsoft Windows Server 2008 R2 COA EP COAS16 Microsoft windows Server 2016 64Bit COA 2 2 2 Electronics configuration The Dell R320 based server is approved for installation in the Honeywell 1000 mm deep LCN cabinet only using the Sliding ReadyRail II kit included in the purchase of the server 2 2 3 Electronics module The tables in this section provides the electronics module f...

Page 13: ...Volt 230 Volts Power Cords l 4 GB RAM 2x2 GB or 8 GB RAM 2x4 GB RDIMM 1333 MHz or faster l SATA DVD RW Drive l 2D Matrox G200 graphics card Following are the common features of MLK server l Intel Xeon E5 2430V2 2 50 GHz 15M Cache 8 GB RDIMM 2x4 GB 146 GB or 300 GB 15K RPM Serial Attach SCSI 6 Gbps 2 5 in Hot plug Hard Drive QTY 4 H710 mini Controller RAID 5 configuration l 1 serial 1Video 2 USB V2...

Page 14: ...face using external Magma PCIe to PCIe convertor box 2 2 7 Power cords The following table lists the AC power cords Part description Part number AC power cord 220 V 51305557 100 NOTE A Local Control Network Processor LCNP board and LCN Media Access Unit MAU are no longer used if the Server has been upgraded to be an ELCN node 2 3 Platform information l Honeywell documentation l Dell documentation ...

Page 15: ...Product Documentation CD Dell PowerEdge R320 Systems Hardware Owner s Manual Removing and replacing the parts Technical specifications Configuring the system Troubleshooting Product Documentation CD www dell com Rack Installation Instructions Sliding Rails Installing the server in a server rack or cabinet Packaged with the computer www dell com Windows Installation Instructions and Important Infor...

Page 16: ... number Description Option Slot 1 PCIe Slot Gen 2 Free Slot Slot 2 PCIe Slot Gen 3 Free Slot 2 5 3 Cnet configuration using PCIC interface Natively the server does not support PCIC interface you must purchase the Magma PCIe to PCI converter box separately and use it Slot number Description Option Slot 1 PCIe Slot Gen 2 Free Slot Slot 2 PCIe Slot Gen 3 Magma Host Card 2 6 Memory configuration for D...

Page 17: ...M for MLK servers 2 6 1 4GB consisting of two 2GB RDIMM for Pre MLK servers The following table provides memory configurations layout for 4GB consisting of two 2GB RDIMM 1333 MHz DIMM socket Memory size Total memory A1 Not available for use A4 Not available for use A2 2GB A5 A3 2GB A6 4GB 2 6 2 8GB consisting of four 2GB RDIMM or two 4GB RIDMM for Pre MLK servers The following table provides memor...

Page 18: ...ory configurations layout for 8GB consisting of two 4GB RIDMM for MLK servers DIMM socket Memory size Total memory A1 Not available for use A4 Not available for use A2 4GB A5 A3 4GB A6 8GB In order to support R50x x release customer needs to buy 2 Modules of MZ PCEM20 and make server to 16GB Population will be as follows DIMM socket Memory size Total memory A1 Not available for use A4 Not availabl...

Page 19: ...GB or 8 GB 2x4 GB RDIMM 1600 MHz or faster DIMM sockets 12 RDIMM or UDIMM DDR3 6 per processor DIMM capacities 2 GB 4 GB DDR3 Advanced ECC RDIMM Minimum RAM 4 GB 2x2 GB RDIMM 1333 MHz for non MLK server 8 GB 2x4 GB RDIMM 1600 MHz or faster for MLK server Maximum RAM 16 GB 4x2 GB RDIMM 1333 MHz for non MLK server 8 GB 4x4 GB RDIMM 1333 MHz or faster for MLK server 2 7 4 Raid controller RAID control...

Page 20: ... Planning 2 7 7 Network interface Adapter type Broadcom 5720 Dual Port 1Gb LOM 2 7 8 Power The following provides the specifications for DC power supply Wattage Energy Smart Dual Hot Plug Power Supplies 350W 20 ...

Page 21: ...2 7 9 Environmental 21 Chapter 2 Planning ...

Page 22: ... 1 C per 300 m 1 8 F per 1 000 ft to 3048 m 10 000 ft is applicable Direct sunlight is not allowed Operating humidity 20 to 80 non condensing with a maximum humidity gradation of 10 per hour Storage humidity 5 to 95 non condensing with a maximum humidity gradation of 10 per hour ATTENTION Storing maximum humidity of 95 is based on a maximum temperature of 45 C 113 F Altitude maximum for storage co...

Page 23: ...Process Measurement and Control Systems Airborne Contaminants 2 7 10 Physical form factor 1U rack height 1U specification 2 7 11 Drive bays Internal 8 x 2 5 inch Hard drive option External Slim optical drive 2 7 12 Maximum vibration Operating 0 26 Grms at 5 Hz to 350 Hz in all orientations Storage 1 87 Grms at 10 Hz to 500 Hz for 15 minutes all six sides tested by Dell 2 7 13 Shock Operating Half ...

Page 24: ...46 GB or 300 GB 2 5 inch SAS 15K RPM hot plug drives hard drives 0 1 2 and 3 are in a RAID 5 configuration with hard drive 4 as a hot spare drive customer need to buy Hot spare separately 2 7 17 External ports Serial One DB 9 connectors LAN 2 x RJ 45 SCSI External None USB Five USB 4 pin ports USB 2 0 Two in front Two in rear and one internal Video 2 1 Front and 1 back 2 7 18 Management Power rela...

Page 25: ...tor on the motherboard DC 5 volt power 6 5 Watts is the operating power requirement for DVD RW drive 2 7 21 Storage and media devices All mass storage devices are connected through SATA and PCIe SATA DVDRW drive is connected through the SATA connector on the motherboard The RAID 5 SAS controller card is located on server motherboard The standard mass storage for this platform has 4 x 146 GB or 300...

Page 26: ...mpliance or Electromagnetic Compatibility EMC Compliance for system equipment configurations that have not been described in this guide as standard system configurations Any equipment configuration other than that described in this publication decertifies the Safety and EMC compliance of this product l Electromagnetic Compatibility l Safety compliance 2 8 1 Electromagnetic Compatibility The follow...

Page 27: ...r system equipment configurations that have not been described in this guide as standard system configurations Any equipment configuration other than that described in this publication decertifies the Safety and EMC compliance of this product l Electromagnetic Compatibility l Safety compliance 2 9 1 Electromagnetic Compatibility The following table provides the Electromagnetic Compatibility EMC sp...

Page 28: ...llic shielding to comply with the above EMC standards 2 9 2 Safety compliance The following are the light industrial regulatory product safety compliance l CSA C22 2 No 1010 1 92 R1999 and 1010 1B 97 R2001 Am 2 l IEC 61010 1 2001 2nd edition ATTENTION In the above referenced standards is a Normative Reference section citing additional standards which may apply as suited and required for product co...

Page 29: ... to TPN System Installation Guide SW20 600 Installing the server and connecting the cables Starting the server l Before you begin 3 1 1 Before you begin Ensure that you perform the following tasks l Ensure that the cabinet is properly grounded l Unpack the platform from the box and verify the parts l Place the server on a secure surface near the cabinet to mount l Ensure that you have the necessar...

Page 30: ...he thermal constraints A 1U high spaced front and side air baffles must be installed immediately above each Dell R320 server This makes the rack space consumed by each server to be 2U Any unused rack space must have a 1U high spaced front and side air baffles installed to prevent air circulation The room ambient temperature must be kept between 10 dm and 30 dm C 50 dm to 86 dm F 3 3 1 Unused cabin...

Page 31: ...shipped from the Honeywell factory with pre assembled Sliding Ready Rails The Sliding Ready Rails II kit and 1U Cable Management Arm kit are included with the purchase of Honeywell part number 51155539 100 Model No MZ PCSV82 l Honeywell server back panel connections l Installing the server l Connecting the cables l Install air duct baffles and blank panel front covers in cabinet 3 4 1 Honeywell se...

Page 32: ...ol console for your human interface pre installed in the Honeywell factory connect the KVM cable mouse and keyboard connections to the USB connectors on the rear of the server The KVM cable may have separate USB connections for the mouse and keyboard or they may be combined into one USB connector through a USB to PS 2 adapter included with the KVM cable 3 4 3 Connecting the cables To connect the c...

Page 33: ... installed 6 To complete the installation turn on the server 3 4 4 Install air duct baffles and blank panel front covers in cabinet Air duct baffles and blank panel front covers ensure that the airflow within the cabinet allows proper cooling for the servers The following image illustrates the air duct baffles and blank panel front covers used in cabinet Figure 3 1 Air Duct Baffle and Blank Panel ...

Page 34: ...to the air duct baffle and right cabinet rail using two machine screws and two external tooth washers threaded into the two clip nuts and then tighten the screws Figure 3 3 Secure Blank Panel Front Cover with Machine Screws 3 Attach the other side of the blank front panel to the left cabinet rail using two machine screws and two external tooth washers threaded into the two clip nuts and tighten th...

Page 35: ...R320 Systems Owner s Manual 3 5 2 Configuring RAID in Dell R320 server Perform the following steps to configure a new virtual disk of RAID5 four physical disks and one hot spare To configuring RAID in Dell R320 server 1 Turn on the server The message Power Edge Expandable RAID controller BIOS Copyright 2008 LSI Corporation Press Ctrl R to Run Configuration utility appears 2 Press CTRL R The VD Mgm...

Page 36: ...l destroy data on the virtual disk Are You Sure you want to continue 16 Press OK The message Virtual disk initialization complete appears 17 Press OK 18 Press ESC to exit The message Are you sure you want to exit appears 19 Press OK to exit from the Virtual Disk Management screen 20 Press CTRL ALT DELETE to restart the server 3 5 3 Starting the TDC emulator services If this is a TPS node with the ...

Page 37: ...at the LCNP status indicates Passed Self Test and the circle is green 3 Verify that the TPN Address appears in the LEDs field of the LCNP Status display after the Board 0 is configured for the node s TPN address You must reset the LCNP after configuration TIP For more information refer to the LCNP Status User s Guide 37 ...

Page 38: ...rs are provided with eight 2 5 inch hard drive chassis Figure 4 1 Front View of Dell R430 Server The following are the explanation for the items in the images 1 Power on indicator power button 2 NMI button 3 System identification button 4 USB connectors 2 5 Optical drive optional 6 LCD menu buttons 7 LCD panel 8 Information tag 9 Video connector 10 Hard drives 11 Hard drives 4 1 2 Rear view of Del...

Page 39: ...nfigured platform must be connected to an ETHERNET network NOTE A Local Control Network Processor LCNP board and LCN Media Access Unit MAU are no longer used if the Server has been upgraded to be an ELCN node l Ethernet network l LCN cables l LCN network l LCN connections l MAU connection l ControlNet Network 4 2 1 Ethernet network ETHERNET 10 100 1000 Base T connection is the standard connection ...

Page 40: ... an LCNP4E Card a MAU cable and the LCN MAU Media Access Unit The LCNP4e card is a PCIe card and is located in PCI ex8 slot 1 The LCNP4E MAU and MAU cable are required on Server Platform The LCN node address must be set to the address the customer wants If the LCN address is not known then the node address must be set to zero 0 Setting the address to zero 0 allows the node to be connected to the L...

Page 41: ...ptic All points on the network must either have an interface card or a terminator Terminators are comprised of termination resistors which are used to mark the beginning and end of a trunk segment and Tap Dummy Load TDL which terminate a drop cable when no node is present The model number for the ControlNet Universal Interface is TC PCIC02 100 The following image displays the PCIC card used by Hon...

Page 42: ...figure a ControlNet interface card using the Magma PE3R PCie to PCI converter box 1 For more information on the Magma PE3R PCie to PCI converter box log into honeywellprocess com 2 Enter your user name and password 3 Go to the Product Support section 4 Search for Magma PE3R instructions l Installing ControlNet card inside Magma chassis 4 3 1 Installing ControlNet card inside Magma chassis Refer to...

Page 43: ...ding additional memory in Dell R320 l Installing hot spare hard drive l Servicing Honeywell options l Verifying correct BIOS settings l Spare parts l Troubleshooting 5 1 Servicing the LCNP4e LCNP4e2 The LCNP4e LCNP4e2 board has 256 MB of on board memory l Adding or replacing the LCNP4E LCNP4e2 board l Modifying VGA port saver 5 1 1 Adding or replacing the LCNP4E LCNP4e2 board The LCNP4E LCNP4e2 bo...

Page 44: ...the LCNP4 board 1 Shut down the computer 2 Remove the power cords from the rear end of the server and wait for 20 seconds 3 Remove the top cover of the server 4 Disconnect the LCN MAU cable from the LCNP4E LCNP4e2 board 5 Lift the card retainers blue plastic notch and push it back 44 Chapter 5 Servicing ...

Page 45: ...CNP4e2 card in PCIe slot 2 7 While wearing a grounded ESD wrist strap grasp the LCNP4E LCNP4e2 card at the corners and gently remove the existing card from PCIe slot 2 8 Insert the replacement LCNP4E LCNP4e2 card firmly into PCIe slot 2 until the card is fully inserted 45 ...

Page 46: ...iners blue plastic notch to lock the inserted LCNP4E LCNP4e2 board in position 10 Replace the top cover of the server 5 1 2 Modifying VGA port saver The VGA port saver must be modified before it is used 46 Chapter 5 Servicing ...

Page 47: ... VGA port saver 1 Using a screwdriver Remove both screw locks on the port saver 2 Replace the screw locks on the VGA Port saver so that the female end of the screw locks faces the same direction as the VGA plug side of the connector 47 ...

Page 48: ... 5 configuration and the fifth hard drive is a hot spare The configuration also contains redundant power supplies Both the hard disk drives and power supplies are hot swappable and must be of same capacity and speed You must replace only one power supply and or hard disk drive at a time in a system that is turned on Refer to the Dell documentation for detailed instructions on swapping the power su...

Page 49: ...roubleshooting Your System Installing System Options Installing Drives Getting Help Jumpers Switches and Connectors I O Ports and Connectors Abbreviations and Acronyms 5 3 Adding additional memory in Dell R320 5 3 1 Prerequisites l Turn off the system l Disconnecting power cords and cables from the server CAUTION The DIMMs are hot to the touch for some time after the system is powered down Allow t...

Page 50: ...gure 5 1 Removal of Top Cover 3 The DIMM memory sockets are now exposed Figure 5 2 DIMM Memory Sockets 4 While wearing a grounded ESD wrist strap press the socket ejectors on the memory module socket down to allow the memory module to be inserted into the socket 5 Insert the memory module Figure 5 3 Installation of Memory Module 50 Chapter 5 Servicing ...

Page 51: ...socket ejectors with your index fingers to lock the memory module into the socket When the memory module is properly seated in the socket the socket ejectors on the memory module socket align with the socket ejectors on the other sockets that have memory modules installed 8 Close the top cover 9 Replace the server in the cabinet 10 Connect the power cords and cables to the back panel of the server...

Page 52: ...ate 3 Remove the blocking plate Figure 5 5 Removal of Blocking Plate 4 Insert the hot spare hard drive in the fifth bay that is bay marked as 4 from where the blocking plate was removed Figure 5 6 Insert the Hot Spare Hard Drive 5 Press the bracket on the hard drive such that it is locked in the fifth bay Figure 5 7 Locking of Bracket 6 The hot spare hard drive is installed in the server Figure 5 ...

Page 53: ...unding strap and grounded work surfaces and equipment when handling any electro statically sensitive components such as the video cards NIC adapter cards and SCSI controller cards Store and transport parts only in electro statically safe containers l LCN node slot requirements l Slot requirements for General Ethernet and FTE node setup 5 5 1 LCN node slot requirements Slot number Description Optio...

Page 54: ...ettings for the server BIOS settings FTE only No FTE but 1 or 2 Ethernet ports Broadcom Dual Onboard NIC Use Onboard NICs NIC1 NIC2 Use one or two Onboard NICs marked as NIC1 and NIC2 l Entering the BIOS l BIOS settings for Tab 51156309 100 l BIOS settings for Tab 51155519 200 l Exiting the BIOS 5 6 1 Entering the BIOS To enter the BIOS 1 Turn on the server 2 Press F2 on the keyboard to enter the ...

Page 55: ...ed Memory operating mode Advanced ECC Mode Node interleaving Disabled CPU information Alternate RTID Disabled Virtualization technology Enabled Adjacent cache prefetcher Enabled Hardware prefetcher Enabled DCU Steamer Prefetcher Enabled DCU IP Prefetcher Enabled Execute Disable Enabled Logical Processor Idling Disabled Number of Cores per processor All Processor 64 bit Support Yes Processor Core S...

Page 56: ...A Mode PORT A B C D F Auto Model Unknown Device type Unknown device Capacity N A PORT E Auto Model Refer to DVD R W model number Device type Optical drive Capacity N A Boot settings Boot Mode BIOS Boot Sequence Retry Enabled Boot sequence 1 Embedded SATA Port Optical Drive E 2 Hard Drive C 3 Embedded NIC1 Port 1 Partition1 BRCM MBA Slot 0200 v15 2 9 56 Chapter 5 Servicing ...

Page 57: ...rts On Internal USB Port On Embedded NIC1 and NIC2 Enabled OS Watchdog Timer Disabled I O AT DMA Engine Disabled Embedded Video Controller Enabled SR 10V Globe Engine Disabled Memory mapped I O above 4GB Disabled Slot 1 Enabled Slot 2 Enabled Serial communication Serial communication On without Console Redirection Serial Port Address Serial Device 1 COM1 Serial Device 2 COM2 External Serial Connec...

Page 58: ...ory refresh rate 1x Memory Operating Voltage Auto Collaborative CPU Performance control Disabled System security Intel AES NI Enabled System Password Not Enabled Setup Password Not Enabled Password Status Unlocked TPM Security Off TPM Activation No Change TPM Clear No Intel TXT Off Power Button Enabled NMI Button Disable AC Power Recovery Off AC power recover delay Immediate User defined delay 60s...

Page 59: ...Dell PowerEdge R320 server System model name R320 001 BIOS Version 2 0 22 or higher Service Tag note the service tag System manufacturer Dell System Manufacturer Contact info www dell com System CPLD version 102 or later Memory information System memory size 8GB System memory type ECC DDR3 System memory speed 1600 MHz or better System memory voltage 1 35 V or better Video memory 16 MB System memor...

Page 60: ...eamer Prefetcher Enabled DCU IP Prefetcher Enabled Execute Disable Enabled Logical Processor Idling Disabled Number of Cores per processor All Processor 64 bit Support Yes Processor Core Speed 2 50 GHz Processor 1 Family Model Stepping 06 3E 4 Brand Intel Xeon CPU E5 2430 v2 2 5 GHz Level 2 Cache 6 X 256 KB Level 3 Cache 15 MB Number of cores 6 60 Chapter 5 Servicing ...

Page 61: ...ngs Boot Mode BIOS Boot Sequence Retry Disabled Boot sequence 1 Embedded SATA Port Optical Drive E 2 Hard Drive C 3 Embedded NIC1 Port 1 Partition1 BRCM MBA Slot 0200 v15 2 9 Boot option Enable Disable 1 Embedded SATA Port Optical Drive SATA Optical Drive X 2 Hard disk C X 3 Embedded NIC1 Port 1 Partition1 BRCM MBA Slot 0200 v15 2 9 Hard disk drive sequence Integrated RAID Controller 1 PERC H710 M...

Page 62: ...troller Enabled SR 10V Globe Engine Disabled Memory mapped I O above 4GB Disabled Slot Disablement Slot 1 Enabled Slot 2 Enabled Serial communication Serial communication On without Console Redirection Serial Port Address Serial Device 1 COM1 Serial Device 2 COM2 External Serial Connector Serial Device 1 Fail Safe Baud Rate 115200 Remote Terminal Type VT100 VT220 Redirection After Boot Enabled 62 ...

Page 63: ...l Scrub Standard Memory refresh rate 1x Memory Operating Voltage Auto Collaborative CPU Performance control Disabled System security Intel AES NI Enabled System Password Not Enabled Setup Password Not Enabled Password Status Unlocked TPM Security Off TPM Activation No Change TPM Clear No Intel TXT Off Power Button Enabled NMI Button Disable AC Power Recovery Off AC power recover delay Immediate Us...

Page 64: ...er Processor Intel Xeon E5 2430 2 20 GHz 7 2GT s Intel QPI 317 9804 51155517 901 Expansion Ram 2 GB RDIMM 1333 MHz or faster 317 5938 51155148 909 Keyboard Dell QWERTY Keyboard 331 2254 51155517 903 Mouse Optical Mouse Two Buttons USB Black 331 0846 51155517 904 Hard Disk Drive Dell 146 GB 15K 6G 2 5 SAS DP HDD 342 0427 51155517 905 Dell 300 GB 15K 6G 2 5 SAS DP HDD 51155519 905 Rack mount Rails R...

Page 65: ...rated Dell Remote Access Controller 6 iDRAC6 issue Refer to the PN2014 13 for further information about iDRAC6 issue You must search for the PN2014 13 at the following Honeywell Process Solutions support website http www honeywellprocess com support 65 ...

Page 66: ...f any may be found in the materials accompanying the product in the documents or files accompanying such third party materials in a file named third_ party_licenses on the media containing the product or at http www honeywell com ps thirdpartylicenses Documentation feedback You can find the most up to date documents on the Honeywell Process Solutions support website at http www honeywellprocess co...

Page 67: ...te https www honeywellprocess com en US contact us customer support contacts Pages default aspx Training classes Honeywell holds technical training classes that are taught by process control systems experts For more information about these classes contact your Honeywell representative or see http www automationcollege com 67 ...