3
3-38
EMC Fibre Channel Disk-Array Processor Enclosure (DPE) Hardware Reference
Servicing and Upgrading a DPE
Figure 3-27
Removing the Top Filler Module
3. Install a power supply in the empty slot as explained on
page 3-41.
Removing a
Power-Supply Module
CAUTION
!
Turn off the power supply before unplugging the ac line cord from
the supply or removing the supply from the enclosure.
1. Remove the drive fan pack, as shown on page 3-35.
2. Turn off the power supply and unplug its ac line cord as shown
next.
Latch
(one per side)
Top filler module
A.
Push the latches on both sides of the
filler module towards the center.
B.
Pull the filler module
from the slot.
Summary of Contents for FC4500
Page 4: ...EMC Fibre Channel Disk Array Processor Enclosure DPE Hardware Reference iv ...
Page 10: ...x EMC Fibre Channel Disk Array Processor Enclosure DPE Hardware Reference Tables ...
Page 104: ...g 6 EMC Fibre Channel Disk Array Processor Enclosure DPE Hardware Reference Glossary ...
Page 110: ...EMC Fibre Channel Disk Array Processor Enclosure DPE Hardware Reference i 6 Index ...