Procedure
1.
Align the screws with the designated U spaces on the front and rear rack flanges.
Note:
Ensure that the screw holes on the tab of the system retention bracket are seated on the designated U
spaces.
2.
Insert and tighten the two screws using the Phillips #2 screwdriver to secure the rails to the cabinet.
Figure 43 Installing screws
Install the front bezel
Use this procedure to install the front bezel on the server.
Procedure
1.
Align and insert the right end of the bezel onto the system.
2.
Press the release button and fit the left end of the bezel onto the system.
3.
Lock the bezel by using the key.
R840 Equipment Installation
86
Dell EMC VxFlex Ready Node Server Installation Guide
Summary of Contents for EMC VxFlex Ready Node
Page 1: ...Dell EMC VxFlex Ready Node Server Installation Guide Rev 01 October 2019 ...
Page 6: ...Figures 6 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 8: ...Tables 8 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 16: ...Before You Begin 16 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 18: ...R640 Procedures 18 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 56: ...R740XD Procedures 56 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 80: ...R840 Procedures 80 Dell EMC VxFlex Ready Node Server Installation Guide ...