108
Dell EMC Connectrix EC-1700 Cabinet Installation and Setup Manual
Installing Directors into the EC-1700 Cabinet
Figure 78
EC-1700 cable routing (bottom)
Cable egress via the
top of cabinet
For cable egress through the top of cabinet, you must first remove the
quick release perforated panel at the top front of the cabinet via the
latch on the outside top left of the perforated panel.
Cables from the MDS director in the upper position should be routed
directly up the right hand side cable fingers in the top half of the
cabinet and out of the cabinet.
Cables from the MDS director in the lower position in the cabinet
should be routed up the cable fingers at the lower right hand side of
the cabinet then across to the left side of the cabinet via the cable tray