CAUTION:
To ensure proper operation and cooling, all system bays and fans must always be populated with a
component or a blank.
NOTE:
While replacing the hot swappable PSU, after next server boot; the new PSU automatically updates to the same
firmware and configuration of the replaced one. For more information about the Part replacement configuration, see the
Lifecycle Controller User's Guide
at
https://www.dell.com/idracmanuals
NOTE:
While replacing a faulty storage controller or NIC card with the same type of card, after you power on the system;
the new card automatically updates to the same firmware and configuration of the faulty one. For more information
about the Part replacement configuration, see the
Lifecycle Controller User's Guide
available at
NOTE:
Only use certified Optical Fiber Transceiver Class I Laser Products.
Before working inside your system
Prerequisites
Follow the safety guidelines listed in the
.
Steps
1. Power off the system and all attached peripherals.
2. Disconnect the system from the electrical outlet, and disconnect the peripherals.
3. If applicable, remove the system from the rack.
For more information, see the
Rail Installation Guide
relevant to your rail solutions at
4. Remove the system cover.
After working inside your system
Prerequisites
Follow the safety guidelines listed in
.
Steps
1. Replace the system cover.
2. If applicable, install the system into the rack.
For more information, see the
Rail Installation Guide
relevant to your rail solutions at
3. Reconnect the peripherals and connect the system to the electrical outlet, and then power on the system.
Recommended tools
You need the following tools to perform the removal and installation procedures:
●
Phillips #1 screwdriver
●
Phillips #2 screwdriver
●
Torx #T8 screwdriver
●
Torx #T30 screwdriver
●
5 mm hex nut screwdriver
●
Plastic scribe
●
1/4-inch flat blade screwdriver
●
Wrist grounding strap connected to the ground
●
ESD mat
●
Needle-nose pliers
26
Installing and removing system components