
About this task
NOTE:
When driving the screws into the bracket and platform, verify that you torque to 5 lb-in.
NOTE:
When mounting the platform to the dual rack mount tray, remove the rubber pads from the bottom of the platform.
NOTE:
Ensure the platform is in a well-ventilated environment with clearance around the exhaust vents.
Steps
1. Place one or two Edge 600 Series platforms in the dual rack mount tray.
2. Use the eight included M3 screws to attach the platforms to the dual rack mount tray.
Use four screws for each platform.
3. Install the rack mount tray in to your rack using the installation instructions included with the tray.
Optics modules
The Edge 610 system has SFP ports as where the Edge 620, Edge 640, and Edge 680 systems have SFP+ ports.
To support 1 Gbps mode, the Edge 600 platform supports Dell EMC SFP 1 Gbps optic modules.
●
10 GbE SFP+ ports support any 1 G/10 G, SX/SR or LX/LR, dual-speed optical module.
●
10 GbE SFP+ ports support 1000Base-SX/LX optical modules.
●
10 GbE SFP+ passive copper direct-attach cables, also known as DAC, that comply with SFF-8431 and SFF-8472 standards,
0.5m, 1m, 2m, 3m, 5m, 7m.
●
10 GbE SFP+ active optical cable, also known as AOC cables—10 GbE only, no 1 GbE support.
●
10 GbE SFP+ SR, LR, ER optical modules that comply with SFF-8431 and SFF-8472 standards.
●
1 GbE SFP ports support 1000Base-SX/LX optical modules.
NOTE:
1000BASE-SX/LX auto-negotiation (1G AN) is not supported.
Platform power-up
Before you turn on the platform, reinspect the rack mounting or desktop placement of platform, and verify that the power
supply to the Edge 600 Series is secure.
Verify the following:
18
Edge 600 Series installation