
79
Installing and removing system components
Figure 93. Removing PIBs
14
Remove the PIBs and place them on a clean surface.
Installing PIB
CAUTION:
Many repairs may only be done by a certified service technician. You should only perform troubleshooting
and simple repairs as authorized in your product documentation, or as directed by the online or telephone service and
support team. Damage due to servicing that is not authorized is not covered by warranty. Read and follow the safety
instructions that came with the product.
Before attempting to service any part of the Power Interface Board (PIB), make sure the power source and
power cables are turned off and disconnected.
To install the PIB:
The following procedure is provided as reference information only.
1
Make sure the system is turned off before proceeding.
If the system is not turned off, do the following:
A. Log in to the interface. The CLI is displayed.
B. Change directory locations to the specified directory as shown in the following figure.
C. Type the command
Stop
to turn off the system. The turn-off process is fully completed in 2 minutes.