Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
DeLaval milk meter MM27BC
1111 Task Schedule
Task Schedule
Task Schedule
Task Schedule
No 1 Replace MM27BC gasket
No 1 Replace MM27BC gasket
No 1 Replace MM27BC gasket
No 1 Replace MM27BC gasket
Replacement parts or kits:
Art No: 91470502
Required tools:
Wrench
No
No
No
No
Service task
Service task
Service task
Service task
Frequency
Frequency
Frequency
Frequency
Max. interval
Max. interval
Max. interval
Max. interval
Replacement parts
Replacement parts
Replacement parts
Replacement parts
or kits
or kits
or kits
or kits
1
Replace MM27BC gasket
2000h
12 months
91470502
2
Replace fat sampler parts
2000h
12 months
85132601
3
Periodic checking and hints for sampling
2000h
12 months
91548202
89634701
4
Calibration
2000h
12 months
5
Change diaphragm of the RS-valve
4000h
24 months
85850901
85531630
6
Replace rubber tubes
2000h
12 months
7
Replace silicon tubes
4000h
24 months
Frequency
2000h of operation
Max. interval
12 months
Estimated time:
5 min
Service type:
Replace
m
xr
_1
06
12
4
1.
1.
1.
1. Dismount the MM27BC.
DeLaval milk meter MM27BC
DeLaval milk meter MM27BC
DeLaval milk meter MM27BC
DeLaval milk meter MM27BC
161 Preventive maintenance
1 (22)
© DeLaval 2012.All rights reserved.
Printout from Memoviewer 11/6/2012.