background image

Non-Interlock

 AVR45, 75, 95AH

Installation and Operation Manual

Proposition  

65

Warning:

Battery posts, terminals and related accessories contain lead and lead compounds, chemicals 

known to the State of California to cause cancer and reproductive harm. Batteries also contain 

other chemicals known to the State of California to cause cancer. WASH HANDS AFTER HANDLING.

E.P.M. Form No. 1112   Revised  12/21     © 2021 by EPM   Printed in U.S.A.

Summary of Contents for unigy II SPACESAVER Non-Interlock AVR 45 AH

Page 1: ...nd related accessories contain lead and lead compounds chemicals known to the State of California to cause cancer and reproductive harm Batteries also contain other chemicals known to the State of California to cause cancer WASH HANDS AFTER HANDLING E P M Form No 1112 Revised 12 21 2021 by EPM Printed in U S A ...

Page 2: ...rmination b 14 Final Assembly Check Procedure b 18 Safety Shield Assembly b 18 Top Protection Shield Installation b 19 SYSTEM OPERATIONS Charge Voltage b 19 Charge Current b 19 Temperature Compensation b 19 Cell Voltage b 19 Rectifier Ripple Voltage b 19 RECORD KEEPING b 19 ACCEPTANCE TESTING b 20 MAINTENANCE Annual Inspection b 20 Battery Cleaning b 21 Capacity Testing b 21 Cell Removal Procedure...

Page 3: ...tamper with the pressure relief valves except for cell replacement Warranty void if vent valve is removed 7 Inspect flooring and lifting equipment for functional adequacy 8 Adequately secure cell modules racks or cabinets to the floor 9 Connect support structures to ground system in accordance with applicable codes 10 The below IEEE Standards contain additional information Other standards may be r...

Page 4: ...product Grounding When grounding the battery string proper techniques should be applied per electrical standards such as NEC and or local codes Two 0 201 diameter x 0 750 center holes are provided in back of each module to accept a 6 x 0 750 center compression grounding lug The holes must be tapped for a 1 4 20UNC thread and paint must be removed for a proper grounding pad location Note Battery st...

Page 5: ...nnector is aligned it may be removed and the module installation can continue e Reference Appendix C for Base Support layout dimensions f Once all the modules are installed and aligned joining plates pg b 7 Part 3 which are provided with the parts kit should be installed at the top of every stack This provides an additional tool to ensure levelness g Assuming these guidelines are followed the elec...

Page 6: ...nstalled at the outside corners of every 2 modules starting from the bottom and working towards the top This is to be repeated for each stack in the battery system For stacks containing odd number of modules an additional set of safety shield brackets will be required to be installed at the top of the module Use 3 8 16 x 2 50 hardware to install brackets Bracket should be flush with side of module...

Page 7: ... Electrical Connection Connector Assembly 1 The contact surfaces of each individual post on every cell have been cleaned and coated with a thin film of No Ox ID A grease at the factory Assure the contact surfaces are free of dust or dirt prior to assembly 2 The battery string is supplied with a connector package appropriate to the required load the battery string is connected to Review the below c...

Page 8: ...b 8 29 to 33 Plate 5 to 15 Plate 17 to 27 Plate ...

Page 9: ...e will require 2 connectors per connection 1 per side see example below A 4CU package will require 4 connectors per connection 2 per side and a 6CU package will require 6 connectors per connection 3 per side Tighten torque all bolts after all connectors are installed Consult Hardware Torque Requirements pg b 4 for proper torque values b 9 1CU Package Detail 4CU Package Detail 6CU Package Detail 2C...

Page 10: ...points Torque all hardware to 125 in lb 17 to 27 Plate 1 Install L connector with vertical bolt as below Bolt should be installed loosely for future adjustments Duplicate connection process at both connection points 3 Ensure proper alignment of connectors to cell posts 4 Tighten torque the horizontal bolt to 125 in lb prior to tightening and torqueing the vertical bolt in step 1 NOTE For this conn...

Page 11: ...the module Use 3 8 16 x 1 25 hardware Install loosely for future alignment 29 to 33 Plate 1 Install L connector with vertical bolt as below Bolts should be installed loosely for future adjustments Duplicate connection process at both connection points 2 Install C connector to cell post using horizontal bolt as below Bolt should be installed loosely for future adjustments Duplicate connection proce...

Page 12: ...uld be tightened but not torqued All remaining hardware should be torqued Consult Hardware Torque Requirements pg b 4 for proper torque values 4 Attach terminal plate to terminal plate bracket Note position of terminal plate Terminal plate bracket may have to be moved in order to be flush with the terminal plate 6 Assemble the four parts of the top terminal safety shield as detailed below b 12 ...

Page 13: ... 2 hole lug Lug and lug hardware not included COMPLETED ASSEMBLY 5 to 15 Plate Assembly 21 to 27 Plate Assembly 17 to 19 Plate Assembly 125 33 Plate High Rate Assembly 29 to 33 Plate Assembly Top terminal plate hole to hole dimensions typical 21 to 33 top terminal plate detailed above 9 Lugs can be positioned on both sides of the terminal plate b 13 ...

Page 14: ...r future adjustments Replace safety shield bracket at same location from previous step SLEEVE SPACER SLEEVE SPACER 4 Install side terminal connector to battery posts using 1 4 20 bolts Bolts should be installed loosely for future adjustments 3 The side terminal may be located at the bottom module Slot in lower arm of side terminal bracket slips over tab in base plate The upper side terminal bracke...

Page 15: ...le connector 4CU 6CU CONNECTOR PACKAGE 1 4 20 x 1 25 hardware required 1CU 2CU CONNECTOR PACKAGE 1 4 20 x 1 00 hardware required 7 After all parts are installed and alignment is confirmed safety shield bracket hardware should be tightened but not torqued All remaining hardware should be torqued Consult Hardware Torque Requirements pg b 4 for proper torque values 8 Install side terminal shield to s...

Page 16: ...l bracket attachment is different depending on the number of adjacent terminal plates TWO TERMINAL PLATE BRACKET ASSEMBLY FOUR TERMINAL PLATE BRACKET ASSEMBLY SIX TERMINAL PLATE BRACKET ASSEMBLY EIGHT TERMINAL PLATE BRACKET ASSEMBLY Installed in two sections SLEEVE SPACER SLEEVE SPACER SLEEVE SPACER SLEEVE SPACER SLEEVE SPACER SLEEVE SPACER ...

Page 17: ...esigned to use up to 0 50 dia bolt and a maximum 1 75 centers 2 hole lug Plate is capable of handling 4 runs of cable Lugs can be positioned on both sides of the terminal plate Lug and lug hardware not included Lug Positioning Options ...

Page 18: ...r than 10 of the average of all the same type connections i e intercell intermodule etc 4 Battery string performance is based on the output at the cell terminals Therefore the shortest electrical connection between the battery string and the operating equipment results in maximum total system performance Select cable size based on current carrying capability and voltage drop Cable size should not ...

Page 19: ...every 13 F 7 C increase in operating temperature above 77 F 25 C the warranty period will be proportionally reduced by 50 as shown below The battery string operating temperature should not exceed 95 F 35 C and should never exceed 105 F 40 5 C for more than an eight hour period If operating temperatures are ex pected to be in excess of 95 F 35 C contact East Penn for recommendations Discharging at ...

Page 20: ...ll times Review Safety Precautions on pg b 3 Annual Inspection For Renewable Energy Cyclic applications some of the following recommendations may not apply Discharge and recharge affect voltage and ohmic values These readings should be taken only after the battery string has been on continuous uninterrupted float charge for at least one month The following values should be recorded using the Batte...

Page 21: ...t excessive voltage drop and or excessive temperature rise Should it be determined that any individual cell s need to be replaced contact East Penn CELL REMOVAL PROCEDURE 1 Before removing cell review Safety Precautions pg b 3 of this manual Contact East Penn with specific questions or concerns 2 Disconnect Charger and the system ground connection 3 Remove connectors from cell being removed 4 Remo...

Page 22: ...re 1 Cells develop internal pressure Relieving this pressure from the cell will make it easier to install the cell into the module Follow the steps of Cell Removal Procedure item 4 2 Ensure cell polarity is correct prior to installing cell 3 Replace cell retainer bar 4 Refer to Electrical Connection section for installing connectors of replacement cell ...

Page 23: ... 6 Cells 7 Cells 8 Cells 9 Cells 10 Cells 11 Cells 12 Cells 13 Cells 14 Cells 15 Cells 16 Cells 17 Cells 18 Cells 19 Cells 20 Cells 21 Cells 22 Cells 23 Cells 24 ALL FIELDS TO THE RIGHT OF THE CELL NUMBER ABOVE MUST BE COMPLETED EPM ORDER NUMBER WILL APPEAR ON THE SHIPPING LABEL ON THE CARTON COVERING EACH PALLET OF CELLS TO ENSURE CONTINUATION OF WARRANTY SUBMIT FORMS TO East Penn Mfg Co Inc Rese...

Page 24: ...90 2 68 AVR75 13 72 33 1 61 6 09 17 44 7 91 6 97 3 16 AVR75 15 83 38 1 86 7 03 20 13 9 13 8 05 3 65 AVR75 17 94 43 2 10 7 96 22 81 10 35 9 12 4 14 AVR75 19 105 48 2 31 8 75 25 08 11 38 10 02 4 55 AVR75 21 116 53 2 60 9 84 28 19 12 79 11 27 5 11 AVR75 23 127 58 2 84 10 77 30 87 14 00 12 34 5 60 AVR75 25 137 62 3 09 11 71 33 56 15 22 13 42 6 09 AVR75 27 148 67 3 34 12 64 36 23 16 44 14 48 6 57 AVR75...

Page 25: ...b 25 APPENDIX C Non Interlock Base Anchor Hole Pattern ...

Page 26: ... 51 8 10 2 280 2 430 50 Cell Type Max Charge Current A Min Charge Current A AVR45 5 16 5 4 9 AVR45 7 24 7 7 4 AVR45 9 32 9 9 9 AVR45 11 41 1 12 3 AVR45 13 49 4 14 8 AVR45 15 57 6 17 3 AVR45 17 65 8 19 7 AVR45 19 74 1 22 2 AVR45 21 82 3 24 7 AVR45 23 90 5 27 2 AVR45 25 98 7 29 6 AVR45 27 107 32 1 AVR45 29 115 34 6 AVR45 31 123 37 0 AVR45 33 132 39 5 Cell Type Max Charge Current A Min Charge Current...

Page 27: ... 412 2 262 2 442 69 8 20 2 415 2 265 2 445 68 0 19 2 418 2 268 2 448 66 2 18 2 421 2 271 2 451 64 4 17 2 424 2 274 2 454 62 6 16 2 427 2 277 2 457 60 8 15 2 430 2 280 2 460 59 0 14 2 433 2 283 2 463 57 2 13 2 436 2 286 2 466 55 4 12 2 439 2 289 2 469 53 6 11 2 442 2 292 2 472 51 8 10 2 445 2 295 2 475 50 3mV per ºC Renewable Energy Cyclic Voltage Compensation Renewable Energy Cyclic Charge Paramet...

Page 28: ...5 29 150 AVR45 31 161 AVR45 33 172 AVR95 Series Cell Type Max Charge Current A AVR95 7 67 8 AVR95 9 90 4 AVR95 11 113 AVR95 13 136 AVR95 15 158 AVR95 17 181 AVR95 19 203 AVR95 21 226 AVR95 23 248 AVR95 25 271 AVR95 27 294 AVR95 29 316 AVR95 31 339 AVR95 33 361 Cell Type Max Charge Current A AVR75 5 35 5 AVR75 7 53 2 AVR75 9 70 9 AVR75 11 88 7 AVR75 13 106 AVR75 15 124 AVR75 17 142 AVR75 19 160 AVR...

Page 29: ...___________________________________________ mfg model Rectifier Mfg Model__________________________________________________ AC Ripple Voltage _______________________ Note if voltage is expressed in RMS Peak or Peak To Peak Environment i e Hut Central Office etc ___________________________________________________________________________________________________________ Consult Cell type Battery Type...

Page 30: ...__________________________ Cell Serial Cell Volts Cell Connector Ohmic Value Cell Serial Cell Volts Cell Connector Ohmic Value No Number Temp Float Ohmic Value 1 2 3 No Number Temp Float Ohmic Value 1 2 3 61 111 62 112 63 113 64 114 65 115 66 116 67 117 68 118 69 119 70 120 71 121 72 122 73 123 74 124 75 125 76 126 77 127 78 128 79 129 80 130 81 131 82 132 83 133 84 134 85 135 86 136 87 137 88 138...

Page 31: ...6 197 237 198 238 199 239 200 240 Battery Maintenance Report Company_______________________________________________________________________ Service Date________________________________________________ Address_______________________________________________________________________ Battery Dwg ________________________________________________ Battery Location I D Number_ _ ____________________________...

Page 32: ... www dekabatteries com E P M Form No 1112 12 21 2021 by EPM Printed in U S A All data subject to change without notice No part of this document may be copied or repro duced electronically or mechanically without written permission from the company e mail reservepowersales dekabatteries com ...