2.2 Installation and parameter setup
2.2.1 Wiring installation
Terminals for NEL and GB feedback have been changed. The table below shows an overview of the terminals
on PPU-2 and PPU-3.
General de-
scription
Terminal
PPU-2
Terminal descrip-
tion
Terminal
PPU-3
Terminal descrip-
tion
Note
Power supply
1
24 V DC (+)
1
24 V DC (+)
Power supply
2
0 V DC (-)
2
0 V DC (-)
Non-essential
load trip
5 + 6
Relay 1 (NO)
8 + 9
Relay 8 (NO)
Difference be-
tween the ter-
minals
Generator
breaker trip
alarm
11 + 12
Relay 3 (NO)
11 + 12
Relay 11 (NO)
Breaker off/trip
14 + 15
Relay 4 (NO)
14 + 15
Relay 14 (NO)
Breaker close
17 + 18
Relay sync (NO)
17 + 18
Relay 17 (NO)
Alarm ack.
24
Digital input
24
Digital input
Start sync/
control
25
Digital input
25
Digital input
Common for
terminals
23-27
28
Common
28
Common
Modbus RTU
RS-485
29
30
31
DATA +
DATA GND
DATA -
29
30
31
DATA +
DATA GND
DATA -
Load sharing
37
38
39
Active load sharing
Common
Reactive load shar-
ing
37
38
39
Active load sharing
Common
Reactive load shar-
ing
External f/P set
point
40
41
f/P set point
Common
40
41
f/P set point
Common
De-load
43
Digital input
43
Digital input
Man. GOV
control up
44
Digital input
44
Digital input
Man. GOV
control down
45
Digital input
45
Digital input
Mode 1
48
Digital input
48
Digital input
Fixed frequen-
cy/configurable
Mode 2
49
Digital input
49
Digital input
P load sharing/
configurable
ML-2 application notes Converting PPU-2
to PPU-3 4189341126 UK
Application and installation
DEIF A/S
Page 11 of 18