1. Access the boiler’s terminal block.
¼
Refer to the installation and maintenance instructions of the
boiler.
2. Connect the domestic hot water sensor to the corresponding
terminal on the control panel.
4.6.2.
DHW tank combined with a MCR boiler
WARNING
Only qualified professionals may carry out electrical
connections, always with the power off.
C
0
0
2
8
5
9
-B
2
1
S SYST + TA -
S ECS
S EXT
S DEP C
2 1
2 1
2 1
2 1
2 1
S DEP B
2 1
4
3
SR130
4. Installation
26/03/2014 - 300009755-001-03
18