background image

 

 

QM 

                          1/4 

    IT2705-en

 

 

 

Technical Information 

INNOVENS PRO MCA 160 

 

Wall-hung gas condensing boilers

 

Cascade connection 

 

JS   

 

 

 

 

    N° 

IT2705-en

 

 

 

 

         28/05/2021 

 

1.

 

Purpose : points to check 

Observe the following points for the cascade connection of 

MCA 160 

boilers. 

Remark

: a boiler cascade includes :  

-  A 

master

 

boiler

 : MCA 160 with 

DIEMATIC EVOLUTION

 control panel, 

-  One or more MCA 160 

follower boiler(s)

 with 

DIEMATIC EVOLUTION

 or 

IniControl 2

 

control panel. 

2.

 

Check the software versions of the circuit boards 

Check the following points: 

  Circuit boards 

SCB-10

 (DIEMATIC Evolution) must be in version 

1.04

 or higher. 

  All 

SCB-10

 circuit boards must be at the 

same version

  Burner management circuit boards 

CU-GH06

 must be in version 

2.1

 or higher. 

  All 

CU-GH06

 circuit boards must be at the 

same version

3.

 

Remove the 2 jumpers from the CB-01 circuit boards 

                              

 

1. 

Switch off the power supply, 

2. 

Open the control panel to get access the circuit boards, 

3. 

Remove the 

2 jumpers

 from each of the 

CB-01

 circuit boards in the cascade. 

 

 

EN 

Reviews: