7.5.5.
Assembling the boiler
1. Follow the procedure in reverse to re-assemble all of the
components.
CAUTION
During inspection and maintenance operations, always
replace all gaskets on the parts removed.
2. Fill the siphon with clean water up to the mark.
3. Put the siphon back in place.
CAUTION
Mount the vent hose above the siphon.
4. Carefully open the main water valve, fill the installation, vent it and,
if need be, top it up with water.
5. Check the seals on the gas and water connections.
6. Switch the boiler back on.
C002434-A
T001523-B
MCA 15 - MCA 25 MCA 25/28 MI