![DeDietrich Elitec DTG 1304 Eco.NOx/V Technical Instructions Download Page 22](http://html1.mh-extra.com/html/dedietrich/elitec-dtg-1304-eco-nox-v/elitec-dtg-1304-eco-nox-v_technical-instructions_2462437022.webp)
22
DTG 1300 Eco.NOx/V
23/06/05 - 300002940-001B
Operating cycle with the anti-smoke release thermostat cut
off
In the event of smoke release, the burner is cut and the boiler goes
into standby for 15 minutes. This timed phase is indicated by an
alarm indicator flashing. The 15 minute timed period can only be
interrupted by a sector cut.
Key :
A
Start of operation
A
1
Second ignition attempt
A
2
Third ignition attempt
B
Formation of flame in ignition burner
C
End of first ignition attempt
C
1
End of second ignition attempt
C
2
On safety through absence of flame signal
D
Smoke anti-release thermostat cut
E
Resetting
F
Restart of heater
SF
Burner flame signal
VA
Alarm indicator
TA
Ignition transformer
TAF
Anti-backflow thermostat
TCH
Heat requirement
VBA
Ignition burner valve
VBP
Main burner valve
ts
Safety time : about 55 seconds
tn
Anti-smoke release thermostat cooling time (times
vary)
t
TAF
Box standby time : 15 minutes
5 Checks and adjustments after commissioning
5.1
Checking pressure to the nozzle
`
Unscrew the screw inside the nozzle pressure socket a few
turns.
`
Connect a manometer to the pressure socket and check that
the pressure to the socket corresponds to the pressure stated
below. Adjust the pressure to the injectors if necessary.
`
Tighten the pressure socket screw.
`
Check the seal again
Checking burner safety
Cut the gas by closing the stop tap.
Check the reaction of the safety system. (Safety box on safety
because of ionisation fault).
Checking the safety thermostat
`
Place the Summer/Winter switch on
%
to cut the heating
accelerator to prevent the temperature rising in the installation.
`
Place the 3 position switch "
!
- AUTO - TEST STB" on the
TEST STB position. The burner starts regardless of the setting.
Keep the switch in this position until the safety thermostat cuts
(110ºC).
`
To restart the heater, press the safety thermostat reset button
and repeat the starting operations.
Required input signals
Box output signals
Contact closed
Manifold pressure (mbar)
Natural gas H/E
15
Natural gas L/LL
12,1
Propane
29
Summary of Contents for Elitec DTG 1304 Eco.NOx/V
Page 1: ...DTG 1300 Eco NOx V Gas fired boilers English 23 06 05 Elitec Technical instructions...
Page 31: ...31 23 06 05 300002940 001B DTG 1300 Eco NOx V Gas line Cladding...
Page 32: ...32 DTG 1300 Eco NOx V 23 06 05 300002940 001B Linking kit...
Page 36: ...36 DTG 1300 Eco NOx V 23 06 05 300002940 001B...
Page 37: ...DTG 1300 Eco NOx V 23 06 05 300002940 001B...
Page 38: ...DTG 1300 Eco NOx V 23 06 05 300002940 001B...