
4
Carry out installation in compliance with the prevailing legislation
and standards.
4
Perform the initial start up and carry out any checks necessary.
4
Explain the installation to the user.
4
If a maintenance is necessary, warn the user of the obligation to
check the appliance and maintain it in good working order.
4
Give all the instruction manuals to the user.
1.4
Homologations
1.4.1.
Certifications
CE identification no
CE-0085CM0178
NOx classification
5 (EN 297 pr A3, EN 483)
Type of connection Chimney: B
23
, B
33
Flue gas outlet: C
13
, C
33
, C
43
, C
53
, C
63
, C
83
, C
93
1.4.2.
Gas categories
Gas category Gas type
Connection pressure (mbar)
II
2ESi3P
Natural gas H (G20) 20
Natural gas L (G25) 25
Propane (G31)
37
The boiler is preset in the factory to operate on natural gas H (G20).
¼
For operation on another type of gas, see chapter: "Adapting
to another gas type", page 70.
1.4.3.
Additional Directives
Apart from the legal provisions and Directives, the additional
Directives described in these instructions must also be observed.
For all provisions and Directives referred to in these instructions, it is
agreed that all addenda or subsequent provisions will apply at the
time of installation.
WARNING
Installation of the appliance must be done by a qualified
engineer in accordance with prevailing local and national
regulations.
1. Introduction
AGC 10/15 - AGC 15 - AGC 25 - AGC 35
8
20/01/2012 - 300026081-001-B