
Circuit A
Circuit B
Circuit C
(with AD249 op
tion)
AUX circuit
(with AD249 op
tion)
Domestic hot wa
ter circuit
Domestic hot water produc
tion
Yes
Yes
Yes
Yes
Yes
Domestic hot water produc
tion, electric only
Yes
Yes
Yes
No
No
Stratified tank (2 sensors)
No
No
No
No
Yes
Deactivation
Yes
Yes
Yes
Yes
Yes
4.3.2
Description of the CB–05 connection PCB
The connection PCB connects the power supply and the S-Bus to the box.
1 Electrical power supply
2 S-BUS connection to the EEC-01 PCB
3 S-BUS connection to other boxes or generators
4.4
Standard delivery
The delivery includes:
the housing
the connectors
the cable glands
the installation, use and maintenance manual
4.5
Accessories & options
Various options are available, depending on the configuration of the
installation and the country.
Tab.2
Description
Package
S-Bus cable with terminals, 1.5 m
AD308
S-Bus cable with terminals, 12 m
AD309
S-Bus cable with terminals, 20 m
AD310
S-Bus terminals
AD321
Fig.6
MW
-1
0
0
1
1
0
0
-1
1
2
3
L
N
4 Description of the product
12
7703592 - v02 - 14062018