Instruction manual
Personnel Lock System SMART-LINE
Version 2
Page 7
6. Initial Operation / Assembly
6.1. Preperation
Before assembling the personnel lockp system:
the underground must be clean and even
6.2. Assembly
Loosen the straps of the transport safety.