background image

Instruction manual 

Personnel Lock System SMART-LINE 

 

Version 2 

Page 14 

 

8. Declaration of Conformity 

 
In accordance with the EC directives 

 

 

Machines/plants (2006/42/EC) 

 

 Electromagnetic compatibility (89/336/EEC) 

 

 Low voltage (2006/95/EC) 

 

The type of the machine/plant: 

 

Product / type designation:   

Personnel Lock System SMART-LINE 

is designed, constructed and manufactured in accordance with the above marked directive(s). 

 

Following harmonising standards apply:

 

 

 DIN EN 292, safety of machines, devices and plants 

 

 DIN EN 60 204.1, electrical equipment for industrial machines 

 

Following national norms, directives and specifications apply:

 

 

 

 DIN 8586, bend forming 

 

 DIN 8588, fragmentation  

 

Following national norms, directives and specifications apply: 

 

 Overall plan of the machine/plant with circuit diagram 

 

 Detailed and complete dossiers for the verification of the compliance of the machine/plant 

with the essential health and safety requirements 

 

 A list of the fundamental requirements of EC directives, standards and specifications, which 

were taken into account when designing the machine/plant 

 

 A description of the solutions for the prevention of threads from the machine/plant 

 

 

 A copy of the instruction manual of the machine/plant 

 
 
 
Isselburg, 31.03.2017 

 

 

_______________  

_____________________ 

Place, Date 

 

 

legally binding signature

 

 

Summary of Contents for SMART-LINE 1000

Page 1: ...Original Instruction Manual Personnel Lock System SMART LINE Manufacturer deconta GmbH Im Geer 20 46419 Isselburg Designation Personnel Lock System SMART LINE...

Page 2: ...ransport 4 2 1 Delivery 4 2 2 Transport 4 2 3 Storage 4 3 Delivery Contents 4 4 Technical Description 5 4 1 Unit Description 5 4 2 Description of the Personnel Lock System 5 5 Technical Data 6 6 Initi...

Page 3: ...in accordance with the regulations and never use this Personnel Lock System in an inappropriate way In the event of non observance deconta assumes no liability To ensure safe operation of the lock the...

Page 4: ...must be taken when transporting the unit in order to avoid damage by improper handling or carelessness 2 3 Storage The shower system shall only be stored in a decontaminated state To avoid damage the...

Page 5: ...the asbestos free areas and kept under dynamic negative pressure by means of negative pressure units The personnel lock system SMART LINE was developed and built in order to be able to enter or leave...

Page 6: ...r chamber Model 750 750 x 750 x 2000 mm Model 1000 1000 x 1000 x 2000 mm Weight 3 chamber personnel lock system Model 750 approx 75 kg Model 1000 approx 118 kg Weight 5 chamber personnel lock system M...

Page 7: ...el Lock System SMART LINE Version 2 Page 7 6 Initial Operation Assembly 6 1 Preperation Before assembling the personnel lockp system the underground must be clean and even 6 2 Assembly Loosen the stra...

Page 8: ...Instruction manual Personnel Lock System SMART LINE Version 2 Page 8 Pull the personnel lock chamber apart so that the PVC tarpaulin is stretched Lock the clamping device in the roof and floor area...

Page 9: ...nual Personnel Lock System SMART LINE Version 2 Page 9 Hook the floor element shower under the guide profile of the personnel lock chamber and ensure that the profile snaps in correctly guide profile...

Page 10: ...Instruction manual Personnel Lock System SMART LINE Version 2 Page 10 2 Build up the foldable chambers and place it on the shower tray Place shower roof...

Page 11: ...he shower roof snaps behind the profile of the chambers Insert wall elements of the shower chamber into the guides of the floor element and at the same time ensure that the corner profiles snap behind...

Page 12: ...ual Personnel Lock System SMART LINE Version 2 Page 12 Raise the roof element slightly so that the wall element can snap into the guides Place the shower device on the GEKA connection in the roof guid...

Page 13: ...ce and Care Daily maintenance Check the water pipes for free flow Clean the personnel lock system area daily Clean the personnel lock system carefully after each end of shift Check the floor elements...

Page 14: ...es Following national norms directives and specifications apply DIN 8586 bend forming DIN 8588 fragmentation Following national norms directives and specifications apply Overall plan of the machine pl...

Reviews: