Sound and vibration
Sound and vibration values were measured in
accordance with EN 60745.
L
pA
sound pressure level
60.7 dB(A)
K
pA
uncertainty 3
dB
L
WA
sound power level
71.7 dB(A)
K
WA
uncertainty 3
dB
Wear ear-muffs.
The impact of noise can cause damage to hearing.
Total vibration values (vector sum of three directions)
determined in accordance with EN 60745.
Screwing without hammer action
Vibration emission value a
h
≤ 2,5 m/s
2
K uncertainty = 1,5 m/s
2
Additional information for electric power tools
Warning!
The specified vibration value was established in
accordance with a standardized testing method. It
may change according to how the electric equipment
is used and may exceed the specified value in
exceptional circumstances.
The specified vibration value can be used to compare
the equipment with other electric power tools.
The specified vibration value can be used for initial
assessment of a harmful effect.
Keep the noise emissions and vibrations to a
minimum.
Only use appliances which are in perfect working
order.
Service and clean the appliance regularly.
Adapt your working style to suit the appliance.
Do not overload the appliance.
Have the appliance serviced whenever
necessary.
Switch the appliance off when it is not in use.
Wear protective gloves.
Residual risks
Even if you use this electric power tool in
accordance with instructions, certain residual
risks cannot be rules out. The following hazards
may arise in connection with the equipment’s
construction and layout:
1. Lung damage if no suitable protective dust mask
is used.
2. Damage to hearing if no suitable ear protection is
used.
3. Health damage caused by hand-arm vibrations if
the equipment is used over a prolonged period or
is not properly guided and maintained.
6. Before starting the equipment
Be sure to read the following information before you
use your cordless screwdriver for the first time:
1.
Charge the battery pack with the charger
supplied.
2. Only ever use screwdriver bits which are suitable
for the purpose and in faultless condition.
3. Always check for concealed electric cables and
gas and water pipes when drilling and screwing
in walls.
7. Operation
7.1 Charging the battery (Fig. 2)
1.
Check that your mains voltage is the same as
that marked on the rating plate of the battery
charger. Plug the battery charger in the plug
socket and connect the charging cable to the
charging connection. The charging process
starts as soon as the charging cable is
connected to the charging adapter.
2.
The red LED on the battery capacity indicator (7)
indicates that the battery is being charged.
Important! It does not switch off automatically
when fully charged!
Disconnect the charge cable from the screwdriver
after charging.
Important! The handle may become a little warm
during the charging process. This is normal.
If the battery pack fails to charge, please check
whether there is voltage at the socket-outlet
and check for proper contact with the charging
contacts in the battery charger.
If the battery still fails to charge, send
the battery charger
and the screwdriver
to our customer services department.
10
GB
Anleitung_CSE_4_8_D_SPK7:_ 20.07.2010 10:15 Uhr Seite 10
Summary of Contents for 45.107.08
Page 2: ...2 1 2 1 4 5 6 7 7 3 2 3 2 Anleitung_CSE_4_8_D_SPK7 _ 20 07 2010 10 15 Uhr Seite 2 ...
Page 3: ...3 4 5 6 7 a 1 A Anleitung_CSE_4_8_D_SPK7 _ 20 07 2010 10 15 Uhr Seite 3 ...
Page 17: ...17 Anleitung_CSE_4_8_D_SPK7 _ 20 07 2010 10 15 Uhr Seite 17 ...
Page 18: ...18 Anleitung_CSE_4_8_D_SPK7 _ 20 07 2010 10 15 Uhr Seite 18 ...
Page 19: ...19 Anleitung_CSE_4_8_D_SPK7 _ 20 07 2010 10 15 Uhr Seite 19 ...
Page 24: ...EH 07 2010 01 Anleitung_CSE_4_8_D_SPK7 _ 20 07 2010 10 15 Uhr Seite 24 ...