6. Visual signals and alarms 

The LED frame notifies the user of the status of the DazeBox. The colors and statuses are shown in table

 

 

 

 

 

   

 

   

 

 

 

 

 

 

 

   

 

6.3. 

 

Colore

 

Stato

 

Descrizione

 

Green 

Not connected 

DazeBox is not connected to the vehicle 

Blue 

Charging 

Vehicle is being charged 

Yellow 

Waiting PM 

There is not enough current available to start charging 

the vehicle.. 

Green + Blue 

Connected 

DazeBox is connected to the vehicle but not charged 
(vehicle fully charged or not available to recharge) 

Red 

Error 

In case of error, refer to table 6.4 

 
                                                        ​

Tabella 6.3. Statuses Led. 

 

With flashing red LEDs, DazeBox is in an error state. Each error is associated with a corresponding number

 

 

 

 

       

 

 

 

   

 

   

 

 

of short consecutive flashes. In case of error, contact support. 

 

 
 

Numero lampeggi

 

Errore

 

Temperature to high 

Error on vehicle side 

Generic error 

Overcurrent 

 

 

                                                                              Table 6.4. Error codes 

 

7. Disposal 

 
This chapter explains how to deactivate and dismantle the machine, indicating the residual risks that occur

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

in these situations and the necessary precautions to neutralize these risks. 
Once the end of its technical and operational life has been reached, the machine must be deactivated, or

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

   

taken out of service. 
 
 

Switching off the electricity power supply 

Disconnect cable from the machine side and the fabricated side. Before starting the procedure, check that

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the terminal of the power supply grid is not live. 

19 

ENG - June 2020 - Rev. 1 

Summary of Contents for DazeBox

Page 1: ...DazeBox V5 1 Installation use and maintenance manual 1 ENG June 2020 Rev 1...

Page 2: ...atures 5 3 Use 8 3 1 Intended use 8 3 2 Unintended use 8 4 Installation 9 4 1 Supply 9 4 2 Transport and storage 9 4 3 Preliminary checks 10 4 4 General Criteria for selecting the place of installatio...

Page 3: ...in compliance with current safety regulations Therefore the product does not normally entail any danger to people or things The machine and its components are designed in such a way that they cannot...

Page 4: ...electrical equipment is located degrading the insulating materials The degree of protection of the machine is IP54 that is the environment of use must be clean in the absence of dust or vapors 1 4 War...

Page 5: ...of safety and also for its ability to deliver high currents The control circuit also provides for the communication between the charging station and the vehicle through the PWM Pulse Width Modulation...

Page 6: ...Figure 1 DazeBox charging station and its external components Figure 2 Dimensions of the DazeBox charging station 6 ENG June 2020 Rev 1...

Page 7: ...re range at 32 A from 25 C to 45 C without direct exposure to sunlight Protection degree IP54 There are three types of DazeBox for three different recharging powers in accordance with customer needs M...

Page 8: ...stand by awaiting charging The status of the LEDs is pulsed green To charge the vehicle pull out the charging cable by always holding it by the plug and never by the cable itself and connect it to th...

Page 9: ...ait for the charging cycle to be completed and for the vehicle to be disconnected before opening the device 4 1 Supply Inside the packaging is supplied DazeBox with Type 2 cable of 3 or 5 meters The 5...

Page 10: ...nstall the device in places at risk of explosion EX environment used as escape routes where objects can fall eg hanging stairs or car tires in which it is possible that it is hit by jets of water unde...

Page 11: ...nting on the wall with relative dimensions of the DazeBox with 3 meter cable For Dazebox with 5 meter cable and cable holder refer to figure 5 Figure 5 Depiction of mounting on the wall with relative...

Page 12: ...r edge of the plate figure 4 for the 3 meter cable version 1200 1500 mm with respect to the lower edge of the plate figure 5 for the 5 meter cable version Mark the three holes using a drilling templat...

Page 13: ...current chosen must be suitable for the circuit breaker and the fuse The earth connection is ensured by the user s system The device does not have its own electric grid switch The differential switch...

Page 14: ...agement system setting The installation of power management involves connecting the current transformer to the electric meter In order to complete the installation a 0 5 mm shielded bipolar cable must...

Page 15: ...erly stripped and that the shielding is well in contact with the earth terminal Figure 10 Power management wiring Once the electrical connection is complete the current can be adjusted Using the curre...

Page 16: ...onnection wires to the appropriate length The wires must be as short as possible 2 Remove approximately 12 mm of insulation from the connection wires For thin connection wires it is recommended to use...

Page 17: ...rt 2 The measuring instruments used must comply with national regulations eg DIN EN 60557 VDE 0413 Electrical safety in low voltage grids up to AC 1000V and DC 1500V 3 Measurement results must be docu...

Page 18: ...absence of national regulations manufacturers recommend checking each month Acting on the test button the device must intervene immediately Otherwise contact your trusted technician because the safet...

Page 19: ...ror state Each error is associated with a corresponding number of short consecutive flashes In case of error contact support Numero lampeggi Errore 2 Temperature to high 5 Error on vehicle side 6 Gene...

Page 20: ...nce with the regulations in force in the country of use Decommissioning and disposal of the product When the equipment is disposed of all components and materials must be identified and separated to a...

Page 21: ...Registered office Via per Curnasco 24127 Bergamo Italy Headquarters Via Aldo Moro 2c 24030 Almenno San Bartolomeo BG Italy Mail head dazetechnology com Tel 39 035 1983 1355 Website www dazetechnology...

Reviews: