4.7. Commissioning 

Clean the connection area (remove material residues and dirt).  

Before commissioning, check that all screw are correctly fastened.  

Switch on the supply voltage. After the self-test the status LED of the Viridian must light up after

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

15-20 seconds in blue and the general status LEDs light up green. 

Perform the initial checks required by local directives and laws in force.  

Close the DazeBox connection panel cover.  

Fit the housing cover.  

Before starting up the system for the first time, check the effectiveness of the relative safety measure(s)

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

according to the national regulations in force. 

Electrical systems or devices must be checked by the manufacturer of the system or device before being

 

   

 

 

 

   

 

   

 

   

 

 

 

put into operation for the first time. The same also applies to the expansion or modification of existing

 

 

 

 

 

 

 

 

 

 

   

 

   

   

 

electrical systems or devices. However, we expressly draw your attention to the need to comply with all the

 

   

 

 

 

 

 

 

   

 

   

 

   

 

safety measures.  

The points to be considered include the following: 

1. Checks: continuity of the protection conductor connections, insulation resistance, residual current

 

   

 

 

 

 

 

 

 

 

of the differential switch, intervention time must be checked on the extended and / or modified part.  

2. The measuring instruments used must comply with national regulations, eg DIN EN 60557 (VDE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0413) "Electrical safety in low-voltage grids up to AC 1000V and DC 1500V".  

3. Measurement results must be documented. On the basis of the check, a test report must be

 

 

 

 

 

 

 

   

 

   

 

 

 

 

compiled to be kept.  

5. Maintenance 

 
Before intervening on the machine for any maintenance operation, wait for the machine to stop completely

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

and switch it off by activating the main stop switch. Disconnect the machine from the power supply line by

 

   

   

 

 

 

 

 

 

 

 

 

 

 

 

   

operating the main switch on the electrical cabinet. 
 

 ​

Safety warnings 

Disconnect the device from the mains 

Check that there is no voltage 

Earth the circuit and short-circuit the installation 

Mark the danger points 

 

 ​

Warnings for authorized personnel when opening the device 

Take care not to damage the device after opening the body 

Do not open the device in outdoor locations in rainy conditions 

Danger of breaking the plastic housing: 

-

Pay attention to the reuse of the same screws for the various fixing points. 

-

Screw carefully to avoid the risk of stripping the body fixing plate. 

-

Do not tighten the fixing screws with force 

Electronic components may be irreparably damaged in the event of contact. 

Before handling the groups, discharge the electric charges by touching a metal object and grounded. 

 
 
The charging station does not require specific maintenance. 

17 

ENG - June 2020 - Rev. 1 

Summary of Contents for DazeBox

Page 1: ...DazeBox V5 1 Installation use and maintenance manual 1 ENG June 2020 Rev 1...

Page 2: ...atures 5 3 Use 8 3 1 Intended use 8 3 2 Unintended use 8 4 Installation 9 4 1 Supply 9 4 2 Transport and storage 9 4 3 Preliminary checks 10 4 4 General Criteria for selecting the place of installatio...

Page 3: ...in compliance with current safety regulations Therefore the product does not normally entail any danger to people or things The machine and its components are designed in such a way that they cannot...

Page 4: ...electrical equipment is located degrading the insulating materials The degree of protection of the machine is IP54 that is the environment of use must be clean in the absence of dust or vapors 1 4 War...

Page 5: ...of safety and also for its ability to deliver high currents The control circuit also provides for the communication between the charging station and the vehicle through the PWM Pulse Width Modulation...

Page 6: ...Figure 1 DazeBox charging station and its external components Figure 2 Dimensions of the DazeBox charging station 6 ENG June 2020 Rev 1...

Page 7: ...re range at 32 A from 25 C to 45 C without direct exposure to sunlight Protection degree IP54 There are three types of DazeBox for three different recharging powers in accordance with customer needs M...

Page 8: ...stand by awaiting charging The status of the LEDs is pulsed green To charge the vehicle pull out the charging cable by always holding it by the plug and never by the cable itself and connect it to th...

Page 9: ...ait for the charging cycle to be completed and for the vehicle to be disconnected before opening the device 4 1 Supply Inside the packaging is supplied DazeBox with Type 2 cable of 3 or 5 meters The 5...

Page 10: ...nstall the device in places at risk of explosion EX environment used as escape routes where objects can fall eg hanging stairs or car tires in which it is possible that it is hit by jets of water unde...

Page 11: ...nting on the wall with relative dimensions of the DazeBox with 3 meter cable For Dazebox with 5 meter cable and cable holder refer to figure 5 Figure 5 Depiction of mounting on the wall with relative...

Page 12: ...r edge of the plate figure 4 for the 3 meter cable version 1200 1500 mm with respect to the lower edge of the plate figure 5 for the 5 meter cable version Mark the three holes using a drilling templat...

Page 13: ...current chosen must be suitable for the circuit breaker and the fuse The earth connection is ensured by the user s system The device does not have its own electric grid switch The differential switch...

Page 14: ...agement system setting The installation of power management involves connecting the current transformer to the electric meter In order to complete the installation a 0 5 mm shielded bipolar cable must...

Page 15: ...erly stripped and that the shielding is well in contact with the earth terminal Figure 10 Power management wiring Once the electrical connection is complete the current can be adjusted Using the curre...

Page 16: ...onnection wires to the appropriate length The wires must be as short as possible 2 Remove approximately 12 mm of insulation from the connection wires For thin connection wires it is recommended to use...

Page 17: ...rt 2 The measuring instruments used must comply with national regulations eg DIN EN 60557 VDE 0413 Electrical safety in low voltage grids up to AC 1000V and DC 1500V 3 Measurement results must be docu...

Page 18: ...absence of national regulations manufacturers recommend checking each month Acting on the test button the device must intervene immediately Otherwise contact your trusted technician because the safet...

Page 19: ...ror state Each error is associated with a corresponding number of short consecutive flashes In case of error contact support Numero lampeggi Errore 2 Temperature to high 5 Error on vehicle side 6 Gene...

Page 20: ...nce with the regulations in force in the country of use Decommissioning and disposal of the product When the equipment is disposed of all components and materials must be identified and separated to a...

Page 21: ...Registered office Via per Curnasco 24127 Bergamo Italy Headquarters Via Aldo Moro 2c 24030 Almenno San Bartolomeo BG Italy Mail head dazetechnology com Tel 39 035 1983 1355 Website www dazetechnology...

Reviews: