4.7. Commissioning
●
Clean the connection area (remove material residues and dirt).
●
Before commissioning, check that all screw are correctly fastened.
●
Switch on the supply voltage. After the self-test the status LED of the Viridian must light up after
15-20 seconds in blue and the general status LEDs light up green.
●
Perform the initial checks required by local directives and laws in force.
●
Close the DazeBox connection panel cover.
●
Fit the housing cover.
Before starting up the system for the first time, check the effectiveness of the relative safety measure(s)
according to the national regulations in force.
Electrical systems or devices must be checked by the manufacturer of the system or device before being
put into operation for the first time. The same also applies to the expansion or modification of existing
electrical systems or devices. However, we expressly draw your attention to the need to comply with all the
safety measures.
The points to be considered include the following:
1. Checks: continuity of the protection conductor connections, insulation resistance, residual current
of the differential switch, intervention time must be checked on the extended and / or modified part.
2. The measuring instruments used must comply with national regulations, eg DIN EN 60557 (VDE
0413) "Electrical safety in low-voltage grids up to AC 1000V and DC 1500V".
3. Measurement results must be documented. On the basis of the check, a test report must be
compiled to be kept.
5. Maintenance
Before intervening on the machine for any maintenance operation, wait for the machine to stop completely
and switch it off by activating the main stop switch. Disconnect the machine from the power supply line by
operating the main switch on the electrical cabinet.
Safety warnings
▪
Disconnect the device from the mains
▪
Check that there is no voltage
▪
Earth the circuit and short-circuit the installation
▪
Mark the danger points
Warnings for authorized personnel when opening the device
▪
Take care not to damage the device after opening the body
▪
Do not open the device in outdoor locations in rainy conditions
▪
Danger of breaking the plastic housing:
-
Pay attention to the reuse of the same screws for the various fixing points.
-
Screw carefully to avoid the risk of stripping the body fixing plate.
-
Do not tighten the fixing screws with force
▪
Electronic components may be irreparably damaged in the event of contact.
▪
Before handling the groups, discharge the electric charges by touching a metal object and grounded.
The charging station does not require specific maintenance.
17