background image

CAP10CNC-MN-EN-01 

JUN-2020

CAP10CN is industrial version of PulseCAP10, designed for industrial applications like generator, stationary fule tank in

factory, building, construction site...CAP10CN has 4-20mA output or RS485/ModbusRTU output, can be connected

easily to any industrial devices like PLC, IoT Gateway, iConnector... CAP10CN has very high accuracy 0.1% of span, can

be used for tank up to 30.000 liters volume.

The technicians who install sensor, must be graduated from college of mechanic or electric.

The mechanical installation staff (drill, cut, grind, etc.) must have skills in mechanical engineering.

The electrical installation staff (connect, etc.) must have skills in electrical engineering.

The technician must be trained before using.

CAP10CNC is intended to use with Diesel Oil, Vegetable Oil.

CAP10CNC must not be used with other flammable fluid such as Gasoline, Alcohol, Ethanol, Acetone, Toluene or

other solvents.

Be careful while drilling, cutting, grinding, etc. The fuel tank or other flammable fluid.

Daviteq is not responsible for compensation in case of explosion to bodily injury or property damage.

Read specifications thoroughly and make sure that its output are suitable to reading devices.

Power supply must be in the permitted range.

USER GUIDE FOR FUEL LEVEL
SENSOR CAP10CNC

This document is applied for the following products

1. Introduction

2. Notes

3. Safety

4. Note Before Installation

Summary of Contents for CAP10CNC

Page 1: ...ing The electrical installation staff connect etc must have skills in electrical engineering The technician must be trained before using CAP10CNC is intended to use with Diesel Oil Vegetable Oil CAP10CNC must not be used with other flammable fluid such as Gasoline Alcohol Ethanol Acetone Toluene or other solvents Be careful while drilling cutting grinding etc The fuel tank or other flammable fluid...

Page 2: ...4000mm by extension probe or cut down to 100mm Output 4 20mA output with 250 ohms precision resistor or RS485 ModbusRTU Power supply 8 50VDC Consumption max 35mA Working pressure 1 2 barg Working temperature 40 oC 85 oC Accuracy 0 1 of span at 25 oC Temperature drift 0 03 of span per 10oC Resolution 1 1000 of span Sensor materials Alloy Engineering plastic Electrical connection connector M12 match...

Page 3: ...Φ38 02 Pump 11 Silicone gasket 03 Rivet clippers In case of using stainless steel rivet 12 Twist drill 4 mm In case of using stainless steel rivet 04 Tube cutter 13 Electrical tape 05 Swivel Blade 14 Cutting pliers 06 Hacksaw 15 Phillips screwdriver 7 Tools ...

Page 4: ...ty of the fuel level data 4 Drilling the central hole After determining the center of the oil tank we clean the surface and use a 38 mm drill to make a hole on the oil tank Remove any burrs from the drilled hole by a file Before drilling it is vital to check whether the hole is affected by the internal metal frame or obstacles at the bottom the tank 5 Flange installation Place the 4 mm rubber gask...

Page 5: ...ermine the length of the sensor to be installed as picture below C L 20 20 H 14 C L 26 H mm C Length to be cut L Original length of the sensor H Height of the tank Example Sensor length is L 2000 H 1700 mm C 326 mm Cut the sensor pipe length of 326 mm ...

Page 6: ...in 180 degrees from final tighten position and assuring that the oil will be not spilled as below picture Use the 2mm Allen key to lock the hex bolt to protect the sensor rotate backwards Connect the sensor with the cable Use sensor head seal to cover the sensor and then use plastic and then use plastic twister seal to lock the head seal and connector seal to protect the sensor Please follow the b...

Page 7: ... enter Calibration Mode press the CALIB button on top housing 3 times time interval between press not greater than 1 5 seconds LED will blinked at 5Hz in Calibration mode GET ZERO 4mA After cutting clean the probe put the probe in the media at expected level near the bottom or leave the probe at dry condition press CALIB button in 0 2 3 seconds the LED will alwaysON in this press time ZERO is achi...

Page 8: ...2 3 or 6 months by Cover a sensor s vent before using the air sprayer for another Remove and clean the filter footer No Phenomena Reasons Solutions 1 Modbus failed to communicate Connection or configuration error Check the connection Check the Modbus configuration Address Baud Rate Parity 13 Periodic Cleaning Guidance 14 Troubleshooting ...

Page 9: ...defects from the manufacturer depending on the actual situation Daviteq will consider replacement or repairs Notes One way was shipping cost to the warranty centre shall be paid by Customers 1 The warranty period has expired 2 Product is not manufactured by Daviteq 3 Product failed due to damage caused by disasters such as fire flood lightning or explosion etc 4 Product damaged during shipment 5 P...

Page 10: ...G Nam Hung Vuong Res An Lac Ward Binh Tan Dist Ho Chi Minh City Vietnam Tel 84 28 6268 2523 4 ext 122 Email info daviteq com www daviteq com Revision 2 Created Thu Feb 17 2022 1 35 AM by Kiệt Anh Nguyễn Updated Thu Feb 17 2022 6 15 AM by Kiệt Anh Nguyễn ...

Reviews: